Skip to main content
Glama

init_project

Initialize a new project by creating a structured task management system with Markdown files, enabling organized task tracking, updates, and dependencies across projects.

Instructions

Initialize a new project with task management structure

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
projectNameYesName of the project to initialize

Schema Changelog

Changes observed during successful MCP inspections. Dates show when Glama detected each change.

  1. First observedv1.0.0

TDQS

C2.9/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are provided, so the description carries the full behavioral burden. It says 'initialize' and 'task management structure' but does not disclose side effects, idempotency, whether an existing project is overwritten, or what happens on failure. For a mutating tool this is a notable gap.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is a single sentence with no filler. The core verb and resource appear first, and 'with task management structure' adds useful context without bloating the text.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The tool is simple, but with no annotations and no output schema, the description should at least indicate return behavior or post-conditions. It does not explain what 'initialized' means operationally, whether a project ID is returned, or how success is communicated. An agent is left guessing at the result of the call.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% and projectName is self-describing in the schema. The description adds no new constraints, format expectations, or naming rules, but the schema already documents the sole parameter sufficiently, so a baseline of 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description uses a specific verb ('Initialize') and resource ('a new project') and adds scope ('with task management structure'), making its purpose clear. It distinguishes itself from the task-focused siblings (create_task, update_task, etc.) by targeting project bootstrap rather than task operations, though it does not explicitly contrast with list_projects.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

No guidance is given about when to use this tool versus alternatives. The description implies it should be used before task operations, but it never states prerequisites, whether projects should already exist, or when list_projects would be the better choice.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Latest Blog Posts

MCP directory API

We provide all the information about MCP servers via our MCP API.

curl -X GET 'https://glama.ai/api/mcp/v1/servers/aderevyankin/task-manager-mcp'

If you have feedback or need assistance with the MCP directory API, please join our Discord server