Log the same time on several days
log_time_on_daysAdd the same project time entry (minutes, note) to up to 31 dates, skipping days already logged for that project unless skip_existing is false.
Instructions
Add the same entry (project, minutes, note) on up to 31 dates. Days that already have time for this project are skipped and reported unless skip_existing is false.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| note | No | What was done (max 2,000 characters) | |
| dates | Yes | The days to log, YYYY-MM-DD (1 to 31 dates) | |
| minutes | No | Whole minutes per day (use this or duration) | |
| project | Yes | Project id, or "Client / Project" (just the project name works when it is unique) | |
| duration | No | Duration text per day, such as "1h30" (use this or minutes) | |
| skip_existing | No | Skip days that already have time for this project (default true) |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| created | Yes | Days that got an entry | |
| minutes | Yes | Minutes logged on each day | |
| project | Yes | "Client / Project" | |
| skipped | Yes | Days skipped because they already had time |