Log time
log_timeAdd a single timesheet entry with project, date, and minutes or duration, plus an optional note. Check existing entries first if the day may already be logged.
Instructions
Add one time entry: a project, a date, how long, and what was done. Give minutes or a duration text. This adds a new entry; it never merges with an existing one. Check list_entries first if the day may already be logged.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| date | Yes | The day the work was done, YYYY-MM-DD | |
| note | No | What was done (max 2,000 characters) | |
| minutes | No | Whole minutes worked (use this or duration) | |
| project | Yes | Project id, or "Client / Project" (just the project name works when it is unique) | |
| duration | No | Duration text such as "1h30" (use this or minutes) |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| logged | Yes |