simulate_cost
Estimate project cost and timeline ranges using Monte Carlo simulation. Input uncertain cost items to get P10, P50, and P90 outcomes with a histogram.
Instructions
Monte Carlo simulation for cost/timeline estimation under uncertainty. Uses PERT/triangular distributions. Returns P10 (optimistic), P50 (likely), P90 (pessimistic) with histogram.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"items": "<items>"
},
"name": "simulate_cost"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| unit | No | Unit for display (default: $) | |
| items | Yes | Cost/timeline items with uncertainty ranges | |
| iterations | No | Number of simulation iterations (default: 10000) |