Skip to main content
Glama

estimate_project

Estimate project timeline, team composition, and costs by selecting project type and scale. Covers MVP to enterprise to help plan development resources and budget.

Instructions

Estimate project timeline, team composition, and costs based on features and scale.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
scaleYesProject scale
team_sizeNoNumber of developers (default: 2)
project_typeYesProject type
Install Server

TDQS

C2.9/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations provided, the description carries the full burden of behavioral disclosure, but it only states what is estimated. It does not indicate whether the tool produces a report, performs deterministic calculations, persists anything, or what the response looks like.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is a single sentence with no filler and leads with the core purpose. It is appropriately sized, though slightly too terse to convey important usage or output details.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Given no output schema, no annotations, and a crowded set of sibling tools, the description is under-specified. It does not explain return structure, how the estimate is presented, or how it relates to overlapping tools like assess_team and simulate_cost.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the parameters are already documented. The description adds general context about scale but references 'features,' which does not map to any input parameter, and does not clarify how team_size influences the estimate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description clearly states the verb 'estimate' and the resource 'project', listing concrete outputs: timeline, team composition, and costs. However, it does not differentiate from sibling tools like assess_team or simulate_cost, which likely overlap in team and cost estimation.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no guidance on when to use this tool versus alternatives such as assess_team or simulate_cost. The description implies a high-level estimation use case but provides no exclusions, prerequisites, or context for choosing it over siblings.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Other Tools

Latest Blog Posts

MCP directory API

We provide all the information about MCP servers via our MCP API.

curl -X GET 'https://glama.ai/api/mcp/v1/servers/Tai-DT/archify-mcp'

If you have feedback or need assistance with the MCP directory API, please join our Discord server