Skip to main content
Glama

Modify schematic parts (batch, attribute-safe)

sch_modify

Modify schematic parts by moving, rotating, mirroring, renaming, revaluing, setting attributes, marking DNP, or swapping LCSC parts while preserving existing attributes, position, and designator.

Instructions

Move / rotate / mirror / rename / re-value parts, set any attribute, mark DNP (addIntoBom=false), or swap to another LCSC part (keeps position & designator). Attribute-safe: EasyEDA normally wipes all other attributes and the supplier part number on modify — this tool merges and verifies, so nothing is lost. Moving a part does NOT drag its wires; re-run sch_connect or delete/re-route wires of affected nets afterwards.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "items": "<items>"
    },
    "name": "sch_modify"
  }
}

Input Schema

NameRequiredDescriptionDefault
itemsYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the disclosure burden and does well: it explains that EasyEDA normally wipes other attributes and the supplier part number on modify, that this tool merges and verifies, and that moving does not drag wires. It omits batch atomicity (what happens if one of up to 100 items fails), the result/confirmation shape, and any permission or rate constraints.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three tight sentences: operations first, the differentiating safety guarantee second, the wiring caveat last. No filler, and the most decision-relevant facts are front-loaded.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

A complex batch mutation tool with no annotations and no output schema is covered well on behavior and side effects. The remaining gap is failure semantics for a 1-100 item batch and what the call returns, which an agent would want before issuing a large modify.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 0% for the nested item fields, so the description must compensate; it does map several fields to meaning, notably addIntoBom=false as DNP and lcsc as a part swap that preserves position/designator. However it never distinguishes x/y from dx/dy, gives no units for rotation, and does not explain the mirror axis or when to use ref vs designator for renaming.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States specific verbs and resources up front: "Move / rotate / mirror / rename / re-value parts, set any attribute, mark DNP ... or swap to another LCSC part." The name and title (batch, attribute-safe modify) are matched by the description, and the sibling relation to sch_connect is made explicit by naming it as the follow-up for wires.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is clear from the enumerated operations plus the LCSC-swap note that position & designator are kept. It also gives conditional follow-up guidance ("re-run sch_connect or delete/re-route wires of affected nets afterwards"), but gives no explicit when-not or opt-for-sch_delete/sch_place contrast.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.