Skip to main content
Glama

Routing status / ratsnest

pcb_status

Checks PCB connectivity from copper geometry: reports fully routed nets, unrouted pad islands, and shorts between nets; copper pours are excluded.

Instructions

Which nets are fully connected by copper and which pads are still unrouted (islands), plus shorts between different nets. Computed from geometry (pours not counted).

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "pcb_status"
  }
}

Input Schema

NameRequiredDescriptionDefault
netsNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

B3/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are supplied, so the description carries the full behavioral burden. It usefully discloses that results are derived from geometry and that copper pours are excluded, which explains false 'island' reports, but it says nothing about read-only vs mutating behavior, cost/latency on large boards, or whether an empty/partial result is possible.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two tight sentences with the primary result (connected vs unrouted) front-loaded and the important computation caveat appended. The parenthetical '(islands)' and 'pours not counted' both earn their place; only the slightly fragmentary phrasing keeps it from a 5.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With no output schema and no annotations, the description must cover both behavior and returns; it does reasonably on returns (connected nets, islands, shorts) but gives no shape or granularity for that report. Combined with the wholly undocumented `nets` parameter, an agent has enough to call it but not enough to call it correctly in all cases.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters2/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

There is one optional parameter (`nets`), and schema description coverage is 0%, so the description must explain it — but it never mentions the parameter at all. An agent cannot tell whether `nets` narrows the report to specific nets, changes the output shape, or is required for shorts detection, so the description adds no meaning beyond the bare schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a concrete resource and output: fully connected nets, unrouted pads (islands), and shorts between nets. It is not a bare restatement of the title 'Routing status / ratsnest' and an agent can tell it is a connectivity report rather than a DRC or copper-inspection tool. It stops short of explicitly differentiating itself from close siblings like pcb_drc or pcb_copper.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is only implied: an agent can infer this is the tool for 'are all nets routed / are there shorts', and the caveat 'pours not counted' signals when results may be misleading. There is no explicit when-to-use, when-not-to-use, or named alternative (e.g. versus pcb_drc for rule violations), so the agent must infer routing between siblings.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.