Skip to main content
Glama

project_get

Retrieve project details by providing a project key for effective task planning and tracking.

Instructions

Get project information by key

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
keyYesProject key to retrieve
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are provided, so the description carries the full burden. It only states 'Get project information' without disclosing any behavioral traits (e.g., read-only nature, error handling, rate limits). This is insufficient for a tool with no annotations.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is a single, clear sentence with no wasted words. It front-loads the purpose and is appropriately concise.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a simple tool with one parameter and no output schema, the description is minimally adequate. However, it does not explain what 'project information' includes or how to handle missing keys, leaving some gaps.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the schema already documents the 'key' parameter well. The description adds no additional meaning beyond the schema's parameter description.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description uses the verb 'Get' and identifies the resource as 'project information' with the method 'by key'. While it distinguishes from siblings like project_list (which likely does not require a key), it does not explicitly state how it differs from project_list or other siblings.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description implies usage context (use when you have a project key), but it does not provide explicit guidance on when to use this tool versus alternatives such as project_list or project_get vs task_get.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Install Server

Other Tools

Latest Blog Posts

MCP directory API

We provide all the information about MCP servers via our MCP API.

curl -X GET 'https://glama.ai/api/mcp/v1/servers/Skye-flyhigh/telos-mcp'

If you have feedback or need assistance with the MCP directory API, please join our Discord server