update_timeline_entry
Modify an existing timeline entry in the active campaign by ID, applying a patch to correct or update event details.
Instructions
Update an existing timeline entry in the active campaign by ID.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"id": "<id>",
"patch": "<patch>"
},
"name": "update_timeline_entry"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | ||
| patch | Yes |