prime_update_schedule_item
Update a schedule item’s details, dates, progress, or assignment using the current version to prevent conflicting edits.
Instructions
Update a schedule item. Requires version for optimistic locking.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"schedule_item_id": "<schedule_item_id>",
"version": "<version>"
},
"name": "prime_update_schedule_item"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| name | No | ||
| version | Yes | Current version for optimistic locking | |
| end_date | No | ||
| progress | No | ||
| start_date | No | ||
| assigned_id | No | ||
| description | No | ||
| schedule_item_id | Yes | The schedule item ID to update | |
| assigned_contact_id | No |