Skip to main content
Glama
Prime MCP Server

Prime MCP Server

by MikahDev

prime_create_schedule_item

Create a scheduled task with start and end dates and optionally assign it to a user or contact. Use it to add work items to an existing schedule.

Instructions

Create a new schedule item (task) with start/end dates and optional assignment.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "schedule_id": "<schedule_id>",
      "name": "<name>",
      "start_date": "<start_date>",
      "end_date": "<end_date>"
    },
    "name": "prime_create_schedule_item"
  }
}

Input Schema

NameRequiredDescriptionDefault
nameYesItem name/title
end_dateYesEnd date/time
progressNoCompletion percentage
depends_onNoIDs of schedule items this depends on
start_dateYesStart date/time
assigned_idNoAssigned user ID
descriptionNoItem description
schedule_idYesThe schedule ID this item belongs to
assigned_contact_idNoAssigned contact ID

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

C2.9/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations provided, the description carries the full behavioral burden and does not meet it. It notes that assignment is optional but says nothing about required permissions, what happens if schedule_id is invalid, whether progress defaults to 0, or how depends_on cycles are handled — all material for a mutation with 9 parameters.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single front-loaded sentence with no filler or redundancy. It is efficient, though its brevity comes at the cost of the behavioral detail noted elsewhere rather than through deliberate prioritization.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 9-parameter mutation tool with no annotations and no output schema, one sentence is not enough. An agent is left without any indication of preconditions, error behavior, permission needs, or what a successful creation returns.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so every parameter is already documented in the schema, making a baseline of 3 appropriate. The description only restates that assignment is optional and that start/end dates are core, adding essentially no meaning beyond the structured fields.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gives a specific verb+resource ('Create a new schedule item') and scopes it with 'start/end dates and optional assignment,' so an agent knows exactly what entity is produced. It does not explicitly contrast itself with siblings like prime_update_schedule_item or prime_list_schedule_items, leaving differentiation to the name alone.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no statement of when to use this versus prime_update_schedule_item or prime_list_schedule_items, and no prerequisites are given (e.g., whether the parent schedule_id must already exist, or how depends_on items must be ordered). The only implied guidance is the obvious create-vs-update distinction carried by the name.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools