plasticity_refresh_datum
Re-resolve a geometry-backed datum after a document revision change, updating its reference so CAD operations stay aligned with the current model.
Instructions
Re-resolve a geometry-backed datum after a document revision change.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| intent | No | ||
| reference | Yes |