Skip step 4 or 6 with a reason
skip_stepSkip step 4 (power) or step 6 (base rates) by providing a required short reason that will appear in the report.
Instructions
Only steps 4 (power) and 6 (base rates) can be skipped, with a short reason that will appear in the report.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| step | Yes | ||
| reason | Yes |