audit_technological_completeness
Audit a BoQ workbook for omitted items across six civil engineering completeness chains, then generate ready-to-insert supplemental item payloads.
Instructions
[v0.4 Tool 13] Audit a BoQ workbook against 6 civil engineering technological completeness chains
(asphalt, block paving, gravity sewers, pressure water lines, RC foundations, industrial slabs)
and generate ready-to-insert `BoQSupplementalItemInput` (K-tétel) payloads for omitted items.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"boq_xlsx_path": "<boq_xlsx_path>"
},
"name": "audit_technological_completeness"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| locale | No | Language for generated supplemental item descriptions ('en', 'de', or 'hu'). | hu |
| sheet_names | No | Optional list of visible worksheet names to check. | |
| boq_xlsx_path | Yes | Absolute path to the BoQ Excel workbook (.xlsx / .xlsm) to audit. | |
| cad_curb_length_m | No | Optional CAD-measured curb length (m) to populate if curbs are missing from BoQ. | |
| cad_asphalt_tie_in_length_m | No | Optional CAD-measured asphalt tie-in length (m) for saw-cutting and joint sealing. | |
| cad_shallow_pipe_concrete_m3 | No | Optional C12/15 concrete encasement volume (m3) for shallow pipes (<1.0m cover). |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| findings | No | ||
| warnings | No | ||
| file_path | Yes | ||
| total_items_scanned | Yes | ||
| active_chains_detected | No | ||
| missing_companions_count | Yes | ||
| ready_supplemental_items | No |