construction-supervision-mcp
Server Configuration
Describes the environment variables required to run the server.
| Name | Required | Description | Default |
|---|---|---|---|
| PROGRESS_DB_PATH | No | Optional custom path for the SQLite database file used to store project progress. If not provided, the server uses the default database file. |
Instructions
Guidance the server publishes about itself, which clients place ahead of the tool catalog so the model reads it before choosing anything.
This server publishes no instructions, or was last inspected before Glama recorded them.
Capabilities
Features and capabilities supported by this server
Protocol revision2025-11-25
| Capability | Details |
|---|---|
| tools | {
"listChanged": false
} |
Tools
Functions exposed to the LLM to take actions
| Name | Description |
|---|---|
| get_stage_guidanceA | Returns detailed guidance for a construction stage, including description, prerequisites, materials, activities, supervision points, common mistakes, and safety notes. |
| generate_supervision_checklistB | Generates a supervision checklist for a construction stage at a specific moment (before, during, or after). |
| record_project_progressA | Records or updates progress for one stage of a construction project. Persists data in SQLite. |
| get_next_possible_stagesA | Reviews stored project progress and identifies which stages can be started next based on prerequisite dependencies. |
| analyze_quotationA | Analyzes a material or labor quotation against reference concepts, detecting missing items, duplicates, and prices outside reference ranges. |
Prompts
Interactive templates invoked by user choice
| Name | Description |
|---|---|
No prompts | |
Resources
Contextual data attached and managed by the client
| Name | Description |
|---|---|
No resources | |
TDQS
Scored across 5 tools
Each tool targets a distinct task: guidance retrieval, checklist generation, progress recording, next-stage determination, and quotation analysis. The two stage-related tools are clearly differentiated by output type and purpose.
All tool names follow a consistent verb_noun pattern using snake_case, such as get_stage_guidance, record_project_progress, and analyze_quotation. There are no mixed conventions or vague verbs.
Five tools is well-scoped for a construction supervision server. Each tool addresses a meaningful part of the supervision workflow without redundancy or bloat.
The core supervision workflow is covered: guidance, checklists, progress recording, next-stage planning, and quotation analysis. Minor gaps exist around explicit project progress retrieval and project initialization, but these can be worked around in most cases.