get_curva_tiie
Retrieve Mexico's TIIE curve—1-day funding plus 28-, 91-, and 182-day rates—in one batch to compare interbank funding costs across maturities.
Instructions
Curva TIIE: fondeo 1d + 28/91/182 en un lote. / TIIE curve.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "get_curva_tiie"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||