Skip to main content
Glama

hypertool-mcp

README.md3.15 kB
# Configuration Mode - Task Breakdown ## Overview This directory contains the task breakdown for implementing the Configuration Mode feature as specified in the [PRD](../PRD.md). ## Task Dependency Graph ``` TASK-001 (ConfigToolsManager) ├── TASK-002 (Mode Switching Tools) └── TASK-003 (Server Integration) ├── TASK-004 (Auto-Exit Triggers) ├── TASK-005 (Feature Flag) └── TASK-006 (Testing Suite) └── TASK-007 (Documentation) ``` ## Task Summary | Task ID | Title | Priority | Effort | Dependencies | Status | |---------|-------|----------|--------|--------------|--------| | [TASK-001](./TASK-001-config-tools-manager.md) | Create ConfigToolsManager | P0 | 2 days | None | Completed | | [TASK-002](./TASK-002-mode-switching-tools.md) | Implement Mode Switching Tools | P0 | 1 day | TASK-001 | Completed | | [TASK-003](./TASK-003-server-mode-integration.md) | Server Mode Integration | P0 | 2 days | TASK-001, TASK-002 | Completed | | [TASK-004](./TASK-004-auto-exit-triggers.md) | Auto-Exit Triggers | P1 | 1 day | TASK-003 | Completed | | [TASK-005](./TASK-005-feature-flag.md) | Feature Flag Support | P1 | 0.5 days | TASK-003 | Completed | | [TASK-006](./TASK-006-testing-suite.md) | Comprehensive Testing | P1 | 1.5 days | TASK-001 to 005 | Not Started | | [TASK-007](./TASK-007-documentation.md) | Documentation Updates | P2 | 0.5 days | TASK-001 to 006 | Not Started | **Total Estimated Effort**: 8.5 days ## Implementation Order ### Phase 1: Foundation (3 days) 1. **TASK-001**: Create ConfigToolsManager 2. **TASK-002**: Implement Mode Switching Tools ### Phase 2: Integration (3.5 days) 3. **TASK-003**: Server Mode Integration 4. **TASK-004**: Auto-Exit Triggers 5. **TASK-005**: Feature Flag Support ### Phase 3: Quality & Documentation (2 days) 6. **TASK-006**: Comprehensive Testing 7. **TASK-007**: Documentation Updates ## Critical Path The critical path is: TASK-001 → TASK-003 → TASK-006 These tasks cannot be parallelized and form the minimum time to complete the feature. ## Parallelization Opportunities - TASK-002 can be developed in parallel with later parts of TASK-001 - TASK-004 and TASK-005 can be developed in parallel after TASK-003 - Documentation (TASK-007) can be started early and refined throughout ## Success Criteria - [ ] All P0 tasks completed - [ ] Test coverage >80% for new code - [ ] All tests passing - [ ] Documentation complete - [ ] Feature flag working for backward compatibility - [ ] No breaking changes for existing users ## Risk Mitigation 1. **Risk**: Breaking existing functionality - **Mitigation**: Feature flag for backward compatibility 2. **Risk**: Complex state management - **Mitigation**: Comprehensive testing suite 3. **Risk**: User confusion with modes - **Mitigation**: Clear documentation and intuitive mode switching ## Notes for Implementers - Start with TASK-001 as it's the foundation - Ensure backward compatibility throughout - Write tests as you go, don't leave them for the end - Keep the PRD updated if requirements change during implementation

MCP directory API

We provide all the information about MCP servers via our MCP API.

curl -X GET 'https://glama.ai/api/mcp/v1/servers/toolprint/hypertool-mcp'

If you have feedback or need assistance with the MCP directory API, please join our Discord server