floodplain-soft-story.json•2.95 KiB
{
"source": "sf.gov DBI — Floodplain Management Requirements, Soft Story Retrofit",
"source_urls": [
"https://www.sf.gov/comply-floodplain-management-requirements/",
"https://www.sf.gov/step-by-step--get-building-permit-do-soft-story-retrofit/"
],
"last_verified": "2026-02-17",
"description": "Floodplain compliance requirements and mandatory soft story seismic retrofit program",
"floodplain": {
"triggers": {
"both_required": [
"Property located within FEMA FIRM Flood Hazard zone",
"Project involves new construction OR costs exceed 50% of structure's market value"
],
"check_method": "Property Information Map → Environmental Information tab → Flooding: FEMA FIRM Flood Hazards (Coastal)",
"note": "Stormwater flood zones alone do NOT trigger requirements"
},
"required_documents": {
"before_permit_approval": [
"Completed Flood Hazard Zone Protection Checklist (page 5, attachment A of Info Sheet G-28)",
"Checklist signed and stamped by CA-licensed engineer or architect",
"Plans showing property's flood zone"
],
"before_occupancy_certificate": [
"FEMA Elevation Certificate",
"FEMA Flood-proofing Certificate (if using dry flood-proofing methods)"
]
},
"construction_standards": "Projects must be elevated above floodwaters or flood-proofed, and must not cause physical damage to neighboring properties during flooding",
"exemptions": "DBI and SF Planning may modify requirements for historic structures, water-dependent facilities, or exceptional hardships (case-by-case)",
"reference": "Information Sheet G-28"
},
"soft_story": {
"description": "Mandatory seismic upgrade program for specific wood-frame multi-family buildings",
"affected_buildings": "Wood-frame multi-family buildings on mandatory Soft Story property list",
"eligibility_check": "Search DBI's Soft Story property list",
"steps": [
{"step": 1, "title": "Verify eligibility", "detail": "Check if building is on mandatory Soft Story property list"},
{"step": 2, "title": "Design plans", "detail": "Hire designer/architect/engineer. Bring 2 sets."},
{"step": 3, "title": "Complete role forms", "detail": "Owner package or contractor statement"},
{"step": 4, "title": "Submit applications", "detail": "OTC permit application + Green Building forms at Permit Center"},
{"step": 5, "title": "Address plan revisions", "detail": "Update plans per plan check comments, coordinate with assigned plan checker"},
{"step": 6, "title": "Pay fees and begin work", "detail": "3-4.5% of construction cost. Get job card before starting."}
],
"fees": "3-4.5% of construction cost",
"tax_incentive": "Seismic retrofit may qualify for CA property tax exclusion — file claim with Assessor's Office before or within 30 days of completion",
"deadline": "Original deadline was September 15, 2021",
"professional_required": true
}
}