Columbia MCP Server
by smithery-ai
# MCP Servers Migration Plan
## Phase 1: Infrastructure Setup
### 1.1 Repository Structure
- [x] Create monorepo structure
- [x] Set up workspace configuration
- [x] Configure TypeScript settings
- [x] Set up ESLint and Jest
- [x] Create migration and verification scripts
### 1.2 Shared Infrastructure
- [ ] Set up Redis configuration management
```typescript
// shared/config/redis.ts
export interface RedisConfig {
host: string;
port: number;
password?: string;
db?: number;
tls?: boolean;
}
```
- [ ] Create API key management system
```typescript
// shared/config/api-keys.ts
export interface ApiKeyConfig {
key: string;
endpoint?: string;
headers?: Record<string, string>;
}
```
- [ ] Set up logging infrastructure
```typescript
// shared/utils/logger.ts
export interface LogConfig {
level: 'debug' | 'info' | 'warn' | 'error';
format: 'json' | 'text';
destination: 'console' | 'file';
}
```
### 1.3 Core Types and Utilities
- [ ] Define base MCP server types
- [ ] Create common error handling
- [ ] Set up shared testing utilities
- [ ] Implement common validation functions
## Phase 2: Core Services Migration
### 2.1 Filesystem Service
1. Migrate source code
2. Update import paths
3. Add tests
4. Verify functionality
### 2.2 Memory Service
1. Migrate source code
2. Update Redis integration
3. Add tests
4. Verify functionality
### 2.3 GitHub Integration
1. Migrate source code
2. Update authentication handling
3. Add tests
4. Verify functionality
## Phase 3: AI Services Migration
### 3.1 Migration Steps for Each AI Service
1. Create service directory
```bash
mkdir -p services/ai/<service-name>/{src,tests,config}
```
2. Update package.json
```json
{
"name": "@columbia-mcp/ai-<service-name>",
"version": "1.0.0",
"private": true,
"scripts": {
"build": "tsc",
"test": "jest",
"lint": "eslint src/**/*.ts",
"clean": "rimraf build dist"
}
}
```
3. Configure TypeScript
```json
{
"extends": "../../tsconfig.json",
"compilerOptions": {
"outDir": "./build",
"rootDir": "./src"
}
}
```
4. Update API Integration
```typescript
import { ApiKeyConfig } from '@shared/config/api-keys';
export class ApiClient {
constructor(private config: ApiKeyConfig) {}
// Implementation
}
```
### 3.2 AI Services Priority Order
1. MiniMax Server
2. DeepSeek Server
3. Second Opinion
4. Code Interpreter
5. Columbia Copilot
## Phase 4: Data Services Migration
### 4.1 Common Data Service Pattern
```typescript
export abstract class BaseDataService {
abstract fetchData(params: unknown): Promise<unknown>;
abstract validateData(data: unknown): boolean;
abstract transformData(data: unknown): unknown;
}
```
### 4.2 Data Services Priority Order
1. News Server
2. Tides Server
3. Domotz Server
4. CIE Storage
## Phase 5: Tool Services Migration
### 5.1 Tool Service Template
```typescript
export interface ToolService {
name: string;
description: string;
execute(params: unknown): Promise<unknown>;
validate(params: unknown): boolean;
}
```
### 5.2 Tool Services Priority Order
1. Web Research Server
2. Code Interpreter
3. Meta MCP Server
4. Community Servers
## Phase 6: Testing and Verification
### 6.1 Test Coverage Requirements
- Unit Tests: 80% coverage minimum
- Integration Tests: Key workflows covered
- E2E Tests: Critical paths tested
### 6.2 Performance Testing
```typescript
export interface PerformanceMetrics {
responseTime: number;
memoryUsage: number;
cpuUsage: number;
}
```
## Phase 7: Documentation
### 7.1 Required Documentation
- README.md for each service
- API documentation
- Configuration guide
- Deployment guide
- Troubleshooting guide
### 7.2 Documentation Template
```markdown
# Service Name
## Overview
Brief description of the service
## Installation
Installation steps
## Configuration
Configuration options
## Usage
Usage examples
## API Reference
API documentation
## Testing
Testing instructions
## Troubleshooting
Common issues and solutions
```
## Phase 8: Deployment
### 8.1 Deployment Checklist
- [ ] Environment variables configured
- [ ] Dependencies installed
- [ ] Database migrations run
- [ ] Services started in correct order
- [ ] Health checks passing
- [ ] Monitoring configured
- [ ] Backup system verified
### 8.2 Rollback Plan
1. Keep old system running in parallel
2. Document rollback triggers
3. Test rollback procedures
4. Maintain backup of all data
## Phase 9: Monitoring and Maintenance
### 9.1 Monitoring Setup
```typescript
export interface MonitoringConfig {
metrics: {
collect: string[];
interval: number;
};
alerts: {
threshold: number;
notification: string[];
};
}
```
### 9.2 Maintenance Procedures
1. Regular dependency updates
2. Security patches
3. Performance optimization
4. Log rotation
5. Backup verification
## Timeline
- Phase 1: 1 week
- Phase 2: 1 week
- Phase 3: 2 weeks
- Phase 4: 1 week
- Phase 5: 2 weeks
- Phase 6: 1 week
- Phase 7: 1 week
- Phase 8: 1 week
- Phase 9: Ongoing
Total Migration Time: ~10 weeks
## Risk Mitigation
1. **Data Loss Prevention**
- Regular backups
- Validation before migration
- Rollback procedures
2. **Service Disruption**
- Staged migration
- Parallel running
- Quick rollback capability
3. **Integration Issues**
- Comprehensive testing
- Monitoring
- Documentation
4. **Performance Impact**
- Performance benchmarking
- Optimization opportunities
- Scaling considerations