Skip to main content
Glama

MCP Agile Flow

by smian0
template-brd.md5.57 kB
# Business Requirements Document Template Standards <version>1.0.0</version> ## Requirements - Follow standardized BRD structure - Include all required sections - Position the BRD above the PRD in the document hierarchy - Use consistent formatting - Link to related documents (e.g., PRD) ## BRD Structure ### Required Sections #### 1. Header - Title: "Business Requirements Document (BRD) for {project-name}" #### 2. Document Control - Status: Draft/In Review/Approved - Created: {date} - Last Updated: {date} - Version: 0.1 #### 3. Executive Summary - Clear description of the business need - Brief overview of the proposed solution - High-level scope - Strategic alignment #### 4. Business Objectives - Primary business goals - Measurable outcomes - Value proposition - Business drivers #### 5. Market Problem Analysis - Market gaps identified - Customer pain points - Competitive landscape - Problem validation evidence #### 6. Success Metrics - Quantifiable measurements - Current vs. target values - ROI/Value projections - Measurement methods #### 7. Customer Needs - Target user segments - Key user personas - Primary requirements by segment - User journey gaps addressed #### 8. Business Constraints - Budget limitations - Timeline constraints - Resource constraints - Technical limitations - Regulatory requirements #### 9. Assumptions - Business assumptions - Market assumptions - Technical assumptions - Resource assumptions #### 10. Stakeholders - Key stakeholders - Roles and responsibilities - Decision authority matrix - Communication requirements #### 11. Related Documents - Link to PRD (when available) - Other relevant business documents - Reference materials ## Examples <example type="valid"> # Business Requirements Document (BRD) for Imperial Defense Platform v2 ## Document Control - **Status:** Draft - **Created:** 2023-03-15 - **Last Updated:** 2023-03-18 - **Version:** 0.1 ## Executive Summary The Imperial Defense Platform v2 (IDP2) addresses critical security gaps in our galactic defense infrastructure. The Empire faces increasing threats from rebel factions exploiting vulnerabilities in our current installations. IDP2 will serve as both a military deterrent and a symbol of Imperial authority, providing unprecedented defensive capabilities while projecting Imperial power throughout key systems. ## Business Objectives - Increase Imperial territorial control by 35% within core systems - Reduce rebel incursion success rate from 24% to <5% - Improve response time to security threats by 75% - Decrease planetary garrison requirements by 60% - Achieve 300% ROI within 5 standard years through reduced military expenditures ## Market Problem Analysis - Current defense platforms lack sufficient firepower to deter organized rebel fleets - Rebel propaganda effectiveness increased 43% due to perception of Imperial vulnerability - Strategic systems remaining under-protected due to resource limitations - Intelligence reports indicate rebel planning for large-scale coordinated attacks - Competing powers developing advanced weapons technology at accelerated pace ## Success Metrics | Metric | Current Value | Target Value | Measurement Method | |--------|--------------|-------------|-------------------| | Territorial Control | 65% of target systems | 95% of target systems | Quarterly territorial surveys | | Rebel Incursion Success | 24% | <5% | Security incident reports | | Response Time | 4.3 hours | 1.1 hours | Defense system logs | | Garrison Troop Requirements | 1.2M troops | 0.5M troops | Resource allocation system | | Annual Military Budget | 15.7T credits | 12.2T credits | Imperial Treasury reports | ## Customer Needs - Imperial High Command requires centralized command capabilities - Regional Governors need visible security presence to maintain order - Imperial Navy requires advanced docking and repair facilities - Intelligence Division needs enhanced surveillance capabilities - Civilian contractors need safe operational environments ## Business Constraints - Maximum budget allocation of 1 trillion credits per fiscal year - Project timeline not to exceed 6 standard years - Must utilize existing supply chains and manufacturing infrastructure - All technologies must comply with Imperial security protocols - Minimum disruption to existing military operations during construction ## Assumptions - Political support from Imperial Senate will remain stable - Required kyber crystal resources remain accessible - Shipyard capacity will be available as scheduled - Technical expertise can be sourced from existing Imperial Academy graduates - Rebel forces will not significantly change tactics during construction phase ## Stakeholders | Role | Department | Responsibilities | |------|------------|-----------------| | Emperor Palpatine | Imperial Throne | Final approval authority | | Grand Moff Tarkin | Imperial Security | Executive sponsor, resource allocation | | Admiral Piett | Imperial Navy | Operational requirements, integration planning | | Director Krennic | Advanced Weapons | Technical oversight, construction management | | Lord Vader | Executive Office | Special requirements, performance evaluation | ## Related Documents - PRD: To be developed following BRD approval - Imperial Defense Whitepaper (ID-42793) - Threat Assessment Report FY23-IMP-8867 - Budget Allocation Document BAD-IMP-238976 </example> <example type="invalid"> Defense Platform Idea - Build big station - Make it powerful - Scare the rebels - Need budget approval </example>

MCP directory API

We provide all the information about MCP servers via our MCP API.

curl -X GET 'https://glama.ai/api/mcp/v1/servers/smian0/mcp-agile-flow'

If you have feedback or need assistance with the MCP directory API, please join our Discord server