fast-track-validation-plan.mdā¢4.31 kB
---
document: Fast-Track Validation Plan
version: 1.0.0
status: active
author: Claude Desktop
created: 2025-06-27
last_updated: 2025-06-27
---
# Fast-Track Validation Plan - ECCComposerMCP
## šÆ Validation Objective
**Goal**: Working MCP server with core composition workflow within 3-5 days
**Success Criteria**: End-to-end composition creation and sharing functional
## š IMMEDIATE PRIORITY TASKS
### TASK-001: DOM Selector Fix (Claude Code)
**Priority**: š“ CRITICAL - START NOW
**Timeline**: 1-2 days
**Blocking**: Core functionality (create, edit, save compositions)
**Validation Target**: 5/7 tools working (75% functionality)
### TASK-002: Security Quick Fix (Claude Code)
**Priority**: š“ CRITICAL - PARALLEL EXECUTION
**Timeline**: 4-6 hours
**Scope**: Environment variables only (not full auth system)
**Validation Target**: No hardcoded secrets in codebase
## š MINIMUM VIABLE VALIDATION
### Core Workflow Required
```
1. test-connection ā
(already working)
2. create-new-composition ā (DOM selectors broken)
3. edit-composition-metadata ā (depends on #2)
4. save-composition ā (DOM selectors broken)
5. get-composer-url ā
(already working)
```
### Validation Scenario
```
User Story: "I can create a simple composition with text content via Claude Desktop"
Steps:
1. Connect to MCP server ā
2. Create new composition ā (BLOCKER)
3. Add text widget ā (BLOCKER)
4. Save composition ā (BLOCKER)
5. Get shareable URL ā
```
**Current Validation Rate**: 40% (2/5 steps working)
**Target Validation Rate**: 100% (5/5 steps working)
## š ļø DEFERRED TASKS (Post-Validation)
### Strategic Planning (Move to Future Phase)
- TASK-004: User Volume & Scaling Analysis ā **DEFERRED**
- TASK-005: Comprehensive Testing Strategy ā **DEFERRED**
- TASK-006: Production Deployment Architecture ā **DEFERRED**
### Resource Analysis (Sufficient for Validation)
- TASK-003: Phase 1 completed ā
(provides minimum specs)
- TASK-003: Phase 2+ ā **DEFERRED** (use minimum specs for validation)
## ā” VALIDATION TIMELINE
### Day 1-2: Critical Fixes (Claude Code)
- Fix DOM selectors in `create-new-composition`
- Fix DOM selectors in `save-composition`
- Environment variable authentication
- Basic error handling
### Day 2-3: Workflow Testing (Claude Code)
- End-to-end composition creation test
- Simple text widget integration
- URL generation and sharing
- Error scenario handling
### Day 3: Validation (Claude Desktop)
- Comprehensive workflow testing
- Document validation results
- Identify remaining issues
- Go/No-Go decision for production planning
## šÆ SUCCESS CRITERIA
### Technical Validation ā
- [ ] 5/7 MCP tools functional
- [ ] Complete composition workflow working
- [ ] No hardcoded secrets in codebase
- [ ] Basic error handling implemented
### Business Validation ā
- [ ] Composition creation < 60 seconds
- [ ] Generated compositions are shareable
- [ ] Basic content editing functional
- [ ] Reliable connection to EuConquisto platform
### Operational Validation ā
- [ ] Server runs on minimum specs (4GB RAM, 2 cores)
- [ ] Environment variable configuration works
- [ ] Basic monitoring/logging functional
- [ ] Recovery from common errors
## šØ RISK MITIGATION
### If DOM Selectors Cannot Be Fixed
**Plan B**: Request stable CSS selectors from EuConquisto team
**Plan C**: Explore limited API integration possibilities
**Timeline Impact**: +2-3 days for Plan B/C
### If Browser Automation Is Fundamentally Unstable
**Plan D**: Scope reduction to read-only operations
**Plan E**: Proof-of-concept with mock compositions
**Timeline Impact**: Concept validation still possible
## š VALIDATION METRICS
### Performance Targets (Relaxed for Validation)
- Composition creation: <60 seconds (vs <30s production target)
- Browser startup: <10 seconds (vs <5s production target)
- Memory usage: <2GB per session (vs optimized production)
### Reliability Targets (Minimum Viable)
- Success rate: >80% for core workflow
- Error recovery: Manual retry acceptable
- Uptime: Development environment stability
---
**RECOMMENDATION**: Immediately start TASK-001 and TASK-002 in parallel. Defer all strategic planning until validation complete.
**NEXT ACTION**: Begin DOM selector debugging (Claude Code)