TEST-RFQS.mdā¢10.1 kB
# Test RFQs for MCP Quoting System
Here are several ready-to-use test RFQs you can copy and paste into the web interface.
---
## šÆ Test 1: High Confidence Match (Should Match Q-1001)
**Expected: 85%+ match, HIGH confidence**
### Copy this into RFP Description:
```
We need 200 pieces of 6061-T6 aluminum brackets, CNC machined with anodized finish.
Tolerance +/-0.005 inches. Black anodize preferred. Standard deburring required.
Delivery needed by March 2025. Part will be used in aerospace assembly.
```
### Form Fields:
- **Quantity:** 200
- **Customer Name:** Acme Manufacturing
- **Contact Email:** buyer@acme.com
- **Due Date:** 2025-03-15
### What to Expect:
- Match with Quote Q-1001 (92%+ similarity)
- Cost estimate around $12.50-$13.00 per unit
- Lead time: ~21 days
- **HIGH confidence** - green indicator
---
## šÆ Test 2: Stainless Steel with Welding (Should Match Q-0832)
**Expected: 75%+ match, MEDIUM-HIGH confidence**
### Copy this into RFP Description:
```
Request quote for 30 stainless steel 304 assemblies. Laser cut from 1/8" sheet,
TIG welded per drawing, and passivated for corrosion resistance. Tolerances +/-0.010.
Marine application - salt water environment. Need certification of materials.
```
### Form Fields:
- **Quantity:** 30
- **Customer Name:** Marine Systems Inc
- **Contact Email:** orders@marine.com
- **Due Date:** 2025-04-01
### What to Expect:
- Match with Quote Q-0832
- Cost estimate around $45-$50 per unit
- Lead time: ~35 days (welding adds time)
- **MEDIUM-HIGH confidence** - yellow/green indicator
---
## šÆ Test 3: High Volume Aluminum (Should Match Q-0955)
**Expected: 80%+ match, HIGH confidence**
### Copy this into RFP Description:
```
Bulk order for 600 aluminum 6061 components. CNC machined from bar stock,
powder coated RAL 7035 (light gray). Standard tolerances acceptable (+/-0.010).
Simple geometry, no complex features. Used for building construction project.
```
### Form Fields:
- **Quantity:** 600
- **Customer Name:** BuildTech Solutions
- **Contact Email:** purchasing@buildtech.com
- **Due Date:** 2025-05-15
### What to Expect:
- Match with Quote Q-0955
- Lower cost per unit due to volume (~$8-$9)
- Lead time: ~28 days
- **HIGH confidence** - green indicator
---
## šÆ Test 4: Precision CNC Work (Should Match Q-1234)
**Expected: 70-80% match, MEDIUM confidence**
### Copy this into RFP Description:
```
Need 75 units of 6061 aluminum plates. CNC milled to +/-0.003 tolerance.
All edges deburred and chamfered. No special finish - mill finish acceptable.
Parts will be anodized by customer after delivery. Holes tapped for 1/4-20.
```
### Form Fields:
- **Quantity:** 75
- **Customer Name:** Precision Parts Co
- **Contact Email:** engineer@precision.com
- **Due Date:** 2025-03-30
### What to Expect:
- Match with Quote Q-1234
- Cost estimate around $18-$20 per unit
- Lead time: ~14-16 days
- **MEDIUM confidence** - yellow indicator
---
## šÆ Test 5: Marine Grade Stainless (Should Match Q-1567)
**Expected: 85%+ match, HIGH confidence**
### Copy this into RFP Description:
```
RFQ for 25 units of 316 stainless steel fittings. CNC machined from solid bar,
passivated for marine environment, and polished to mirror finish (#8 finish).
Tolerances +/-0.005. All surfaces must be corrosion resistant. Offshore use.
```
### Form Fields:
- **Quantity:** 25
- **Customer Name:** Offshore Marine Equipment
- **Contact Email:** marine@offshore.com
- **Due Date:** 2025-04-20
### What to Expect:
- Match with Quote Q-1567
- Higher cost due to 316 SS and polishing (~$52/unit)
- Lead time: ~21 days
- **HIGH confidence** - green indicator
---
## šÆ Test 6: New Material - Titanium (LOW CONFIDENCE)
**Expected: <70% match, LOW confidence**
### Copy this into RFP Description:
```
We need 100 titanium Grade 5 (Ti-6Al-4V) brackets for aerospace application.
CNC machined with precision grinding to +/-0.002 tolerance. AS9100 certification
required. All dimensions per drawing. Heat treat per AMS 2801. Material certs needed.
```
### Form Fields:
- **Quantity:** 100
- **Customer Name:** Aerospace Components LLC
- **Contact Email:** supply@aerospace.com
- **Due Date:** 2025-06-01
### What to Expect:
- No strong matches (titanium not in database)
- Higher estimated cost (new material)
- **LOW confidence** - red indicator
- System will flag for engineering review
---
## šÆ Test 7: Minimal Information (LOW CONFIDENCE)
**Expected: <50% match, LOW confidence**
### Copy this into RFP Description:
```
Need some metal parts. About 50 pieces. Let me know cost and time.
```
### Form Fields:
- **Quantity:** 50
- **Customer Name:** Startup Company
- **Contact Email:** info@startup.com
### What to Expect:
- Very low or no matches
- Generic cost estimate
- **LOW confidence** - red indicator
- System will request more details
---
## šÆ Test 8: Multiple Processes (MEDIUM CONFIDENCE)
**Expected: 65-75% match, MEDIUM confidence**
### Copy this into RFP Description:
```
Quote needed for 150 steel brackets. Laser cut from 3/16" A36 steel,
bent to 90 degrees, MIG welded at joints, and powder coated black gloss.
Standard tolerances except weld penetration must be full depth.
```
### Form Fields:
- **Quantity:** 150
- **Customer Name:** Industrial Fabricators
- **Contact Email:** quotes@industrial.com
- **Due Date:** 2025-04-10
### What to Expect:
- Partial matches (some processes match)
- Cost estimate based on multiple operations
- **MEDIUM confidence** - yellow indicator
- Review recommended before sending
---
## šÆ Test 9: Simple Parts, High Volume
**Expected: 70%+ match, MEDIUM-HIGH confidence**
### Copy this into RFP Description:
```
1000 simple aluminum spacers, 1" OD x 0.5" ID x 0.25" thick.
6061 aluminum, mill finish acceptable. Tolerance +/-0.005 on all dimensions.
Deburred and tumbled. No special requirements.
```
### Form Fields:
- **Quantity:** 1000
- **Customer Name:** Electronics Manufacturing
- **Contact Email:** buyer@electronics.com
- **Due Date:** 2025-05-01
### What to Expect:
- Match with high volume aluminum quotes
- Very low cost per unit due to volume and simplicity
- Lead time might be longer due to quantity
- **MEDIUM-HIGH confidence**
---
## šÆ Test 10: Complex Assembly
**Expected: Variable, likely MEDIUM confidence**
### Copy this into RFP Description:
```
Assembly required: 4 stainless steel 304 components, laser cut, bent, welded together,
ground smooth at welds, passivated. Quantity 40 assemblies. Each assembly has
3 brackets and 1 base plate. Dimensions per attached drawing (not included in this test).
Tolerance +/-0.020 on bent features, +/-0.010 on cut edges.
```
### Form Fields:
- **Quantity:** 40
- **Customer Name:** Equipment Manufacturers
- **Contact Email:** engineering@equipment.com
- **Due Date:** 2025-04-25
### What to Expect:
- Partial matches with stainless work
- Higher complexity = higher cost
- Lead time extended for welding/finishing
- **MEDIUM confidence**
---
## š How to Use These Tests
### In the Web Interface:
1. **Open the web interface** (START.bat ā [W])
2. **Go to "New Quote" tab**
3. **Copy one of the RFP descriptions above**
4. **Paste into the "RFP Description" field**
5. **Fill in the other fields** (Quantity, Customer, etc.)
6. **Click "Generate Quote"**
7. **Review the results!**
### What to Look For:
ā
**Confidence Level** - Green (high), Yellow (medium), Red (low)
ā
**Match Scores** - Percentage similarity with past quotes
ā
**Cost Estimate** - Detailed breakdown
ā
**Lead Time** - Estimated delivery days
ā
**Matching Fields** - What specifically matched (material, processes, etc.)
---
## š Learning Exercise
Try these in order to understand the system:
**Phase 1: High Confidence (Tests 1, 3, 5)**
- See how the system works with good matches
- Understand the cost breakdown
- Note the match percentages
**Phase 2: Medium Confidence (Tests 2, 4, 8)**
- See partial matches
- Understand when to review estimates
- Learn what causes medium confidence
**Phase 3: Low Confidence (Tests 6, 7)**
- See how system handles new materials
- Understand the warning indicators
- Learn when engineering review is needed
**Phase 4: Edge Cases (Tests 9, 10)**
- High volume effects
- Complex assemblies
- Multiple processes
---
## š” Pro Tips
1. **Compare similar tests** - Try Test 1 with 200 qty, then 50 qty, then 1000 qty
2. **Change materials** - Edit Test 1 to use "304 stainless" instead of "6061"
3. **Add/remove processes** - See how adding "powder coat" changes estimates
4. **Track accuracy** - Note the estimates, compare to your actual costs
---
## šÆ Quick Copy-Paste Templates
### Ultra-Simple Test:
```
200 pcs 6061 aluminum, CNC, anodize, +/-0.005
```
### Quick Stainless Test:
```
50 pcs 304 stainless steel, laser cut, weld, passivate
```
### Quick High Volume Test:
```
1000 pcs aluminum parts, CNC machined, powder coat black
```
---
## š Expected Results Summary
| Test # | Material | Processes | Qty | Expected Match | Confidence |
|--------|----------|-----------|-----|----------------|------------|
| 1 | 6061-T6 | CNC, Anodize | 200 | Q-1001 (92%) | HIGH |
| 2 | 304 SS | Laser, Weld | 30 | Q-0832 (78%) | MED-HIGH |
| 3 | 6061 | CNC, Powder | 600 | Q-0955 (85%) | HIGH |
| 4 | 6061 | CNC, Deburr | 75 | Q-1234 (75%) | MEDIUM |
| 5 | 316 SS | CNC, Polish | 25 | Q-1567 (90%) | HIGH |
| 6 | Titanium | CNC, Grind | 100 | None (<50%) | LOW |
| 7 | Unknown | Unknown | 50 | None (<30%) | LOW |
| 8 | Steel | Laser, Weld | 150 | Partial (65%) | MEDIUM |
| 9 | 6061 | CNC, Tumble | 1000 | Q-0955 (72%) | MED-HIGH |
| 10 | 304 SS | Multiple | 40 | Q-0832 (68%) | MEDIUM |
---
## š Start Testing!
**Pick Test 1 and try it now:**
1. Copy the RFP description
2. Open web interface
3. Paste and fill in fields
4. Click Generate Quote
5. Marvel at the results! š
---
**Want more tests?** Just ask me and I'll create custom RFQs for your specific needs!
**Having issues?** Check WEB-INTERFACE-FIX.md and make sure you rebuilt the project!