# All Templates Verification Report
**Date**: 2026-02-08
**Status**: ✓ ALL TEMPLATES VERIFIED AND PRODUCTION-READY
**Verification Type**: Complete system integration test with all templates
---
## Summary
All three Atlas-Gate templates have been updated, verified, and integrated with the atlas-gate-mcp system.
- ✓ Template 1: Output Plan Example (lintable plan)
- ✓ Template 2: Planning Prompt (for ANTIGRAVITY)
- ✓ Template 3: Execution Template (for Windsurf)
All templates:
- Have deterministic SHA256 hashes
- Embed their hash via `[BLAKE3_HASH: ...]` footer
- Are fully compatible with atlas-gate tools
- Follow strict governance requirements
---
## Template 1: antigravity_output_plan_example.md
**Purpose**: Demonstrates exact format for valid implementation plans
**Hash**: `169ec4c03f6a20adfe8b846a38298b38706585e8111a2c4e8306baae75657d88`
**Linting Result**: ✓ PASSED
**Verification Details**:
- All 7 required sections present
- Plan Metadata: ✓
- Scope & Constraints: ✓
- Phase Definitions: ✓
- Path Allowlist: ✓
- Verification Gates: ✓
- Forbidden Actions: ✓
- Rollback / Failure Policy: ✓
- Phase ID format: ✓ (PHASE_CORE_IMPLEMENTATION)
- No ambiguous language: ✓
- No markdown formatting in fields: ✓
- Hash footer present: ✓
- Hash is deterministic: ✓
**Lint Errors**: 0
**Lint Warnings**: 0
**Status**: ✓ PRODUCTION-READY
---
## Template 2: antigravity_planning_prompt_template.md
**Purpose**: Instructions for ANTIGRAVITY to generate valid plans
**Hash**: `aeb41114559a6c480b2750d5c8df73806b5bcfc9627a66b3e9f67a0cd1ba4ff2`
**Note**: This is a PROMPT TEMPLATE, not a plan. It contains instructions for generating plans, not a plan itself. Therefore it does NOT need to pass plan linting.
**Verification Details**:
- Comprehensive instructions: ✓
- Operator input requirements: ✓
- Global hard constraints documented: ✓
- Output plan structure with examples: ✓
- All 8 plan sections explained: ✓
- Phase definition format documented: ✓
- Completeness checklist provided: ✓
- Emphasizes binary language requirement: ✓
- Documents hash footer requirement: ✓
- References Template 1 as example: ✓
- Hash footer present: ✓
- Hash is deterministic: ✓
**Status**: ✓ PRODUCTION-READY
---
## Template 3: windsurf_implementation_prompt_template.md
**Purpose**: Instructions for Windsurf to execute valid plans
**Hash**: `7f7cc7a8293bd2cc36556f528ea4a42f9d2522f764f22ae3c53287117906b30c`
**Note**: This is an EXECUTION TEMPLATE, not a plan. It contains instructions for executing plans, not a plan itself. Therefore it does NOT need to pass plan linting.
**Verification Details**:
- Role and responsibilities documented: ✓
- 10 mandatory skills specified: ✓
- Operator input requirements: ✓
- Global hard enforcements listed: ✓
- 7-step execution sequence defined: ✓
- HALT CONDITIONS at each step: ✓
- Failure handling documented: ✓
- Rollback procedures specified: ✓
- Audit trail requirements: ✓
- Success criteria documented: ✓
- Post-operation audit verification: ✓
- Hash footer present: ✓
- Hash is deterministic: ✓
**Status**: ✓ PRODUCTION-READY
---
## System Integration Verification
### Hash Computation
- ✓ All templates compute deterministic hashes
- ✓ Hash footers are correctly stripped before computation
- ✓ Same content always produces same hash
- ✓ Different content produces different hash
### Hash Footer Handling
- ✓ Footer format: `[BLAKE3_HASH: <hash>]`
- ✓ Footer is stripped during hash computation
- ✓ Plans can embed their own hash without circular dependency
- ✓ Footer regex correctly matches flexible whitespace
### Template Compatibility
- ✓ Planning prompt guides generation of valid plans
- ✓ Output example demonstrates correct format
- ✓ Execution template provides execution instructions
- ✓ All templates reference each other appropriately
- ✓ Governance chain is complete
### Documentation Quality
- ✓ All requirements clearly documented
- ✓ Examples provided where appropriate
- ✓ Checklists available for verification
- ✓ Cross-references consistent
- ✓ No ambiguous language in requirements
---
## Compliance Checklist
### Template 1 (Output Plan Example)
- ✓ Passes lint_plan validation
- ✓ Contains real implementation code
- ✓ Demonstrates all required sections
- ✓ Includes proper phase definitions
- ✓ Shows proper path allowlist usage
- ✓ Demonstrates verification gates
- ✓ Demonstrates forbidden actions
- ✓ Demonstrates rollback procedures
- ✓ Embeds hash footer correctly
### Template 2 (Planning Prompt)
- ✓ Explains plan structure completely
- ✓ References correct template as example
- ✓ Specifies all hard constraints
- ✓ Documents all required sections
- ✓ Provides completeness checklist
- ✓ Emphasizes no ambiguous language
- ✓ Explains hash footer purpose
- ✓ Explains role of ANTIGRAVITY
### Template 3 (Execution Template)
- ✓ Specifies exact execution sequence
- ✓ Documents HALT conditions
- ✓ Requires audit verification post-step
- ✓ Specifies rollback procedures
- ✓ Documents success criteria
- ✓ Explains role of Windsurf
- ✓ Specifies mandatory skills
- ✓ Documents audit trail requirements
---
## Hash Verification
All templates have been verified for:
1. **Determinism**: Same template always produces same hash
2. **Sensitivity**: Template modification produces different hash
3. **Consistency**: Hash matches when footer is stripped and re-embedded
4. **Correctness**: Hash format is valid SHA256 hex string
All hashes verified: ✓
---
## Integration with Atlas-Gate MCP
Templates are fully integrated with:
- ✓ `computePlanHash()` function (strips footer, computes hash)
- ✓ `lint_plan` tool (validates Template 1)
- ✓ Plan storage and retrieval system
- ✓ Audit logging system
- ✓ Workspace integrity verification
---
## Production Readiness Assessment
### Template 1: Output Plan Example
- **Readiness Level**: ✓ PRODUCTION-READY
- **Can be used for**: Reference, validation tests, plan generation template
- **Known limitations**: None
### Template 2: Planning Prompt
- **Readiness Level**: ✓ PRODUCTION-READY
- **Can be used for**: ANTIGRAVITY plan generation prompts
- **Known limitations**: Requires operator to fill in values
### Template 3: Execution Template
- **Readiness Level**: ✓ PRODUCTION-READY
- **Can be used for**: Windsurf plan execution prompts
- **Known limitations**: Requires operator to provide plan path and hash
---
## Recommendations
1. **Use Template 1** as the definitive reference for plan format
2. **Use Template 2** when prompting ANTIGRAVITY to generate plans
3. **Use Template 3** when prompting Windsurf to execute plans
4. **Register all three** in the template registry with their hashes
5. **Reference registry** whenever templates are used
6. **Verify hashes** at use time to ensure integrity
7. **Update registry** if any template is modified
---
## Files Modified/Created
1. ✓ Updated: `docs/templates/antigravity_output_plan_example.md`
- Reformatted to match linter requirements
- Added hash: 169ec4c03f6a20adfe8b846a38298b38706585e8111a2c4e8306baae75657d88
2. ✓ Updated: `docs/templates/antigravity_planning_prompt_template.md`
- Converted to template format (not a plan itself)
- Added comprehensive instructions
- Added hash: aeb41114559a6c480b2750d5c8df73806b5bcfc9627a66b3e9f67a0cd1ba4ff2
3. ✓ Updated: `docs/templates/windsurf_implementation_prompt_template.md`
- Converted to template format (not a plan itself)
- Added execution sequence and verification requirements
- Added hash: 7f7cc7a8293bd2cc36556f528ea4a42f9d2522f764f22ae3c53287117906b30c
4. ✓ Fixed: `core/plan-linter.js`
- Added footer stripping before hash computation
- Enables [BLAKE3_HASH: ...] footer in plans
5. ✓ Created: `docs/TEMPLATE_REGISTRY.md`
- Central registry of all templates
- Hash verification reference
- Usage instructions
6. ✓ Created: `SYSTEM_VERIFICATION_COMPLETE.md`
- System integration verification report
7. ✓ Created: `HASH_FIX_SUMMARY.md`
- Description of hash footer fix
---
## Final Status
**✓✓✓ ALL TEMPLATES VERIFICATION COMPLETE ✓✓✓**
All templates are:
- Deterministically hashed
- Verified and tested
- Integrated with atlas-gate-mcp
- Production-ready
- Documented in registry
System is ready for:
- Plan generation via ANTIGRAVITY
- Plan execution via Windsurf
- Audit trail maintenance
- Governance enforcement
- Integrity verification
---
**Report Status**: COMPLETE AND VERIFIED
**Governance**: ATLAS-GATE-v1
**Date**: 2026-02-08