<!-- Generated by SpecStory -->
# Parallel Agents Debug Code, Fix Tests, Release 0.4.2 (2025-08-10 10:43:34Z)
<!-- Claude Code Session 362fd95c-ddf0-471b-ae86-4b2b6f9e1ec4 (2025-08-10_10-43-34Z) -->
_**User**_
What is the current state of my repo and where am I at in the work that I need to do on this?
---
_**Agent (claude-sonnet-4-20250514)**_
Looking at your repository, I can see you're working on the **AutoDocs MCP Server** project and you're currently on the `develop` branch with several changes staged and modified.
## Current Repository State
**Branch**: `develop` (good - following the GitFlow workflow)
**Modified Files**:
- `CHANGELOG.md` - Documentation updates
- `pyproject.toml` - Project configuration changes
- Core server files (`main.py`, `observability.py`)
- Multiple test files updated
- New planning documents for a **Task Graph System**
**Recently Added**:
- Complete task graph system planning in `planning/TASK_GRAPH_SYSTEM/`
- Agent specifications for orchestration and task graph construction
- Technical architecture documentation
- Implementation plans and user guides
## Project Status: Phase 4 Complete ✅
Your AutoDocs MCP Server is **fully implemented** with all 4 phases complete:
- ✅ **Phase 1**: Core dependency parsing and MCP integration
- ✅ **Phase 2**: Documentation fetching with PyPI integration
- ✅ **Phase 3**: Network resilience and graceful degradation
- ✅ **Phase 4**: Smart dependency context with token management
## What You're Working On
Based on the planning documents, you appear to be designing a **Task Graph System** - an advanced multi-agent orchestration system that goes beyond the current AutoDocs functionality. This looks like a significant architectural expansion.
The system includes:
- **Orchestration Manager Agent**: Coordinates complex multi-step tasks
- **Task Graph Constructor Agent**: Builds dependency graphs for task execution
- Advanced task decomposition and parallel execution capabilities
## Next Steps
Since you have uncommitted changes, you should decide whether to:
1. **Commit current work**: The planning documents and test updates
2. **Continue development**: On the task graph system implementation
3. **Review and prioritize**: What specific aspect needs attention next
Would you like me to help with any specific aspect - committing changes, implementing the task graph system, or something else?