Draw Schedule: multifamily construction financing
Server Details
Apartment construction loans: HUD vs bank vs fund rules, sizing, Census starts and build times.
- Status
- Healthy
- Uptime
- 100.0% over the last 24 hours
- Last Tested
- Transport
- Streamable HTTP · MCP 2025-11-25
- URL
- ChatGPT
- –
- Claude
- –
TDQS
Scored across 4 tools
Each tool has a clearly distinct role: compare financing rules, historical build timelines, current market data, and project-specific loan sizing. The two financing tools are differentiated by compare_construction_options (generic rules) versus size_construction_loan (runs numbers for a specific project).
All four tools use a consistent snake_case verb_noun pattern (compare_, get_, get_, size_). The verbs are clear and the naming is predictable throughout.
Four tools is well within the 3–15 guideline and each tool serves a distinct purpose in a focused niche domain. The set is scoped, not bloated, and every tool earns its place.
The tools cover financing comparison, timeline data, market data, and loan sizing, but the server name emphasizes 'Draw Schedule' and no tool actually creates, retrieves, or manages a draw schedule. That is a notable gap for the stated purpose.
Available Tools
4 toolscompare_construction_optionsCompare HUD, bank, debt fund and LIHTC construction financingARead-onlyIdempotentInspect
Side-by-side rules for financing apartment construction four ways: HUD 221(d)(4), a bank construction loan, a debt fund and 4% tax credits with bonds. For each: maximum loan size and the rule behind it, rate type, term, coverage test, extra costs and process, with the regulation or HUD letter cited.
Inputs: programs.
get_build_timelineHow long apartment construction takes, by regionARead-onlyIdempotentInspect
Census Survey of Construction averages for apartment buildings: months from permit to start and from start to completion, by U.S. region and building size (5-9, 10-19 or 20+ units), for one completion year with the ten-year trend, plus what the build length means for HUD upfront MIP and construction interest.
Inputs: year, region, building_size.
get_construction_marketApartment construction market: starts, pipeline and bank lending standardsARead-onlyIdempotentInspect
Latest U.S. apartment construction numbers for 5+ unit buildings from the Census Bureau (starts, permits, units under construction, completions; seasonally adjusted annual rate, with year-ago and the pipeline peak) and the Federal Reserve's loan officer survey on construction and multifamily lending standards and demand, plus 30-day SOFR. Optional monthly history.
Inputs: history_months.
size_construction_loanSize a multifamily construction loan three waysARead-onlyIdempotentInspect
Runs the site's construction loan sizer on your project: the HUD 221(d)(4) loan (lower of 87%/90% of cost and the 1.15/1.11 coverage test, with HUD's construction-interest estimate and upfront MIP), the bank regulatory ceiling (80% of value and 15%-of-value HVCRE equity, plus your bank's loan-to-cost if given) and, if you give its loan-to-cost, a debt fund. Returns loan, binding limit, equity needed and interest.
Inputs: stabilized_noi (required), as_completed_value (required), total_development_cost (required), rents, +6 more.
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
Related MCP Connectors
FHA-insured apartment loans from HUD's active file, plus HUD multifamily program rules and limits.
FHA multifamily program chooser and loan sizer on HUD's 2026 limits, ratios, MIP and fees.
Size an apartment loan under Fannie Mae, Freddie Mac and HUD published limits, side by side.
Size and compare financing for 5+ unit apartment buildings: DSCR, LTV, cash-out, bridge takeout.
Related MCP Servers
- AlicenseAqualityBmaintenanceMultifamily real estate deal analysis — analyze deals, score properties, calculate max offer prices, and look up market data. Four tools for underwriting 2-200 unit apartment properties.4224 npm4MIT
- AlicenseAqualityDmaintenanceProvides aggregated municipal development costs for US jurisdictions, including impact fees and utility connection charges, enabling AI agents to assess building feasibility quickly.1415 npmMIT
- AlicenseBqualityBmaintenanceEnables multifamily renovation cost estimation, scope of work generation, contractor bid evaluation, ROI gating, and risk flagging for real estate intelligence agents.11Apache 2.0
- AlicenseNot gradedqualityCmaintenanceEnables querying US residential construction-permit statistics at county, place, and state levels, including monthly, year-to-date, and annual counts and values, time series, and largest period-over-period increases or decreases with imputation and revision metadata.MIT
Glama MCP Gateway
Add one secure layer between your agents and this server.