Skip to main content
Glama

whenship

Server Details

When will it ship? A live what-if Gantt for small teams: realistic dates and deadline risk.

If you are the author of this connector, you can claim ownership. Claimed connector authors can inspect health checks, view analytics, and manage their listing.
Status
Healthy
Uptime
100.0% over the last 24 hours
Last Tested
Transport
Streamable HTTP · MCP 2025-11-25
URL
Repository
HamedShams/whenship
GitHub Stars
5
Server Listing
whenship
ChatGPT
–
Claude
–

TDQS

A4/5.0

Scored across 4 tools

Disambiguation3/5

show_plan and what_if overlap substantially: show_plan accepts the same `changes` and reports before/after comparison, which is essentially what_if's job, and the descriptions acknowledge this by telling the agent which to prefer. find_options is clearly distinct (discovery of options), as is export_plan, but the boundary between the two change-evaluation tools requires careful reading rather than being self-evident.

Naming Consistency4/5

Three tools follow a clean verb_noun pattern (export_plan, find_options, show_plan), and what_if is a recognizable idiom for its purpose. The deviation is minor and does not impede recognition of the set's convention.

Tool Count4/5

Four tools is a tight, well-scoped surface for a scheduling/planning server, with the core capability concentrated in show_plan and the others supporting it. It is slightly lean (no dedicated edit/reset tool), but each tool earns its place and nothing is redundant filler.

Completeness4/5

The lifecycle is largely covered: build and visualize a plan, apply/compare changes, discover improvements, and export in several formats. Minor gaps remain — there is no explicit plan deletion/reset, undo history, or import beyond re-opening a saved JSON — but agents can work around these via `changes` (e.g. removing items).

Available Tools

4 tools
export_planExport planA
Read-onlyIdempotent
Inspect

Returns the plan as a file: json (the whenship save file, re-openable on the website and in Claude), csv (one row per item with dates), ics (calendar with finish dates and deadlines), markdown (the report), or link (a share link with the whole plan inside it). Spreadsheet (XLSX) and image exports are in the chart’s Export menu.

Inputs: plan (required), format (required), lens.

find_optionsFind optionsA
Read-onlyIdempotent
Inspect

Searches realistic changes that would meet more deadlines or make the plan sturdier: reordering, deferring undated work, more availability, one more person, or negotiating a deadline. Every option is re-planned exactly, and returned with its effect and the changes that would apply it (usable with what_if).

Inputs: plan (required), lens, limit.

show_planShow planA
Read-onlyIdempotent
Inspect

Schedules work for a small team and shows an interactive Gantt chart: finish dates per item, deadline risk (on time / tight / late, with a rough chance), what sets the end date, and the best options to meet more deadlines. Use for "when will this ship", "can we make these deadlines", prioritising several projects or clients, and capacity planning. Input: people or teams (lanes) and items in priority order with effort in working days. Returns a text summary plus the chart, which the user edits directly. changes apply edits first (the answer compares before and after); suggestions are options of your own (title + changes), each measured exactly and shown in the chart for the user to apply.

Inputs: plan (required), lens, changes, suggestions.

what_ifWhat ifA
Read-onlyIdempotent
Inspect

Compares a plan before and after a change and reports which finish dates move and which deadlines are newly met or missed. The change is a list of simple changes (move an item to a position, change effort, set or clear a deadline or a can't-start-before date, change a lane's people or availability, add a person or team, add a holiday, change working days, remove an item, change the start date), or an alternative: a whole changed copy of the plan, for anything else (moving work between people, splitting, cutting or adding items, dependencies, hand-offs, several changes at once). Returns the comparison and the changed plan. To apply a change and update the chart in one step, call show_plan with the same changes instead.

Inputs: plan (required), lens, changes, alternative.

Tool Schema Changelog

Recent tool additions, removals, and schema changes observed during successful MCP inspections.

Loading tool schema changelog…

    Related MCP Connectors

    Related MCP Servers

    • A
      license
      Not graded
      quality
      B
      maintenance
      Enables coding agents to produce calibrated time estimates by mining your own finished session history, estimating whole multi-step plans over dependency-aware schedules, recording actuals to correct later forecasts, and backtesting the numbers against past sessions. Runs locally over Claude Code transcripts or Cortex databases, giving quantile ranges (P50/P80/P95) with confidence labels instead of human-timeline guesses.
      MIT
    • A
      license
      Not graded
      quality
      B
      maintenance
      Plans domestic jobs around your available hours by scheduling work and unavoidable waiting, then tracks progress and reschedules as conditions change. It answers deadline questions honestly, suggests what to buy, and tells you the next thing to do.
      MIT
    Try in Browser

    Glama MCP Gateway

    Add one secure layer between your agents and this server.