Show plan
show_planSchedules work for a small team and shows an interactive Gantt chart: finish dates per item, deadline risk (on time / tight / late, with a rough chance), what sets the end date, and the best options to meet more deadlines. Use for "when will this ship", "can we make these deadlines", prioritising several projects or clients, and capacity planning. Input: people or teams (lanes) and items in priority order with effort in working days. Returns a text summary plus the chart, which the user edits directly. changes apply edits first (the answer compares before and after); suggestions are options of your own (title + changes), each measured exactly and shown in the chart for the user to apply.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"plan": "<plan>"
},
"name": "show_plan"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| lens | No | Which dates to show: planned = as estimated (default), likely 1.6×, safe bet 3.1× | |
| plan | Yes | A whenship plan. Pass the current plan (from the chart or the last tool result) unchanged unless the user asked for changes | |
| changes | No | Edits to apply first, in order (same format as what_if) | |
| suggestions | No | Up to three options you propose, after checking them with what_if |