PackIndex
Server Details
Packaging material prices, quote checks, contract price adjustments, pack costing and supplier RFQs.
Glama couldn't complete the latest health check. If this server requires authentication, missing or expired test credentials may be the cause. A test profile lets Glama authenticate for health checks and discover tools; it is separate from your personal connections.
If you are the author, claim ownership, then add or update a test profile under Admin → Test Profile.
- Status
- Unhealthy
- Last Tested
- Transport
- Streamable HTTP · MCP 2025-11-25
- URL
TDQS
Score is being calculated.
Available Tools
26 toolscheck_quoteCheck a supplier quoteRead-onlyIdempotentInspect
Is this supplier price fair? Compares a quoted price (any currency; per t, kg, lb, unit…) with the PackIndex benchmark: difference %, verdict FAIR / HIGH / LOW, where the quote sits in the benchmark's 12-month range and, with a quantity, the overpayment. Free callers are compared with the 12-week delayed reference value.
| Name | Required | Description | Default |
|---|---|---|---|
| code | Yes | PackIndex code, e.g. PP, KRLNR, OCC, GAS_TTF, CORR. Use search_indices if unsure. | |
| unit | No | Quote unit: t, kg, lb, MWh, therm, L, bbl, unit, 1000… (defaults to the benchmark's unit) | |
| price | Yes | Quoted price per unit | |
| region | No | Where the quote is for, e.g. 'Germany' | |
| currency | No | Quote currency (ISO code) | USD |
| quantity | No | Order quantity in the quote's unit | |
| quote_date | No | YYYY-MM-DD; compares with the benchmark on that date (paid plans) |
compare_packaging_optionsDesign Studio: compare optionsInspect
Optimise a Design Studio project (or a material): right-size, lightweight and substitute options with cost and carbon savings anchored to PackIndex. Requires the user's OPN account (sign-in or API key); spends 1 Suite run.
| Name | Required | Description | Default |
|---|---|---|---|
| goal | No | both | |
| material | No | Name of the material (shown in the result) | |
| project_id | No | From draft_packaging_spec (with a costed BoM) | |
| performance | No | Performance floor — use the pair that fits the pack. Downgauging is checked against the floor only when both current and required are given. | |
| index_category | No | Without a project: the material family to find substitutes for — one of BOPET, BOPP, COEX_7L, CRTN_FBB, FBB, FLUTE_NSSC, FLUTE_SC, KRLNR, KRLNR_125, LDPE, LDPE_FILM, LDPE_MONO, LLDPE, LLDPE_FILM, METBOPP, PET_BTL, PP, PP_BLOCK, PP_COPOL, PP_FILM, PP_INJ, PP_INJ_SEMI, PP_SHEET, PVC, SBB, SBS_FOOD, SBS_PPR, THERM_PP, VMPET, WHTOP |
compare_regionsCompare a material across regionsRead-onlyIdempotentInspect
One material across regions — e.g. PP in Europe, US, China and the Middle East — in USD with spreads vs a reference region; add freight per unit and duty % to compare landed costs. Professional plan and above.
| Name | Required | Description | Default |
|---|---|---|---|
| codes | No | Or explicit codes to compare | |
| duty_pct | No | Import duty % into the reference region | |
| material | No | Code or name, e.g. PP, HDPE, OCC, 'polypropylene' | |
| reference | No | Reference code (default: the European benchmark) | |
| freight_per_unit | No | USD freight per benchmark unit into the reference region |
cost_packaging_specDesign Studio: cost a specInspect
Derive the bill of materials for a Design Studio project (or a spec object) and anchor each component to live PackIndex values. Requires the user's OPN account (sign-in or API key); spends 1 Suite run.
| Name | Required | Description | Default |
|---|---|---|---|
| spec | No | Alternative to project_id | |
| project_id | No | From draft_packaging_spec |
draft_packaging_specDesign Studio: brief to specInspect
Turn a plain-language packaging brief into a structured spec (format, materials, dimensions, quantity, assumptions) saved as a Design Studio project. Requires the user's OPN account (sign-in or API key); spends 1 Suite run (Intelligence includes monthly free runs).
| Name | Required | Description | Default |
|---|---|---|---|
| brief | Yes | ||
| project_name | No |
estimate_packaging_priceEstimate a corrugated box priceRead-onlyIdempotentInspect
Price a corrugated RSC box (FEFCO 0201) from internal dimensions and flute (E, B, C, F or double-wall), anchored to the PackIndex RSC benchmark, with a low/mid/high band, optional order total and a next-quarter projection. Returns the sources to cite.
| Name | Required | Description | Default |
|---|---|---|---|
| flute | No | B | |
| format | No | RSC | |
| region | No | Country or region, e.g. 'US', 'Germany', 'Poland' | |
| horizon | No | now | |
| currency | No | Also show the estimate in this currency (ISO code, e.g. CAD, EUR). Defaults to the region's currency; converted at live FX. | |
| quantity | No | ||
| width_mm | Yes | ||
| height_mm | Yes | ||
| length_mm | Yes |
explain_price_moveExplain a price moveRead-onlyIdempotentInspect
Why did a price move? Splits the change over 1w / 1m / 3m / 6m / 1y into the moves of its inputs (e.g. PP ← propylene, gas, power; kraftliner ← OCC, pulp; boxes ← board grades) and the rest (margins, demand, supply). Essential plan and above.
| Name | Required | Description | Default |
|---|---|---|---|
| code | Yes | PackIndex code, e.g. PP, KRLNR, OCC, GAS_TTF, CORR. Use search_indices if unsure. | |
| period | No | 1m |
find_suppliersExchange: find suppliersRead-onlyIdempotentInspect
Who can quote a material or a Design Studio project: live Trade Exchange listings (price vs PackIndex benchmark) plus matched converters from the verified supplier network, filtered by country. Use before post_rfq. A project_id needs the user's OPN account; a material code works for anyone.
| Name | Required | Description | Default |
|---|---|---|---|
| query | No | Supplier name or keywords, e.g. 'Box Co', 'FSC', 'Ontario' | |
| region | No | Supplier country or region, e.g. Canada, CA, Germany, North America | |
| project_id | No | Design Studio project (see list_my_projects) | |
| material_id | No | PackIndex code, e.g. RSC_0201, FBB, KRLNR |
get_all_indicesList index values (paginated)Read-onlyIdempotentInspect
Page through index values by layer: L0 primary inputs, L1 raw materials, L2 semi-finished (paid plans) and L3 finished packs. Prefer get_prices for specific codes; use this for portfolio scans. Paginate with limit/offset (next_offset is returned while more rows remain).
| Name | Required | Description | Default |
|---|---|---|---|
| layer | No | all | |
| limit | No | ||
| offset | No |
get_carbon_indexGet Green Index carbon scoreRead-onlyIdempotentInspect
Carbon footprint: finished packs (L3) in kg CO2e per unit with grade A-D; raw materials and semi-finished (board grades, pulps, polymers, aluminium, steel, cullet) in kg CO2e per tonne, virgin and PEF CFF, optionally at your recycled content. For Scope 3 Category 1: factor × units or tonnes.
| Name | Required | Description | Default |
|---|---|---|---|
| code | Yes | PackIndex code, e.g. PP, KRLNR, OCC, GAS_TTF, CORR. Use search_indices if unsure. | |
| recycled_content | No | Materials only: recycled share 0-1 for the CFF value. |
get_index_forecastGet index forecastRead-onlyIdempotentInspect
12-week forward value for any PackIndex code — inputs, raw materials, semi-finished and finished packs: current level, projection, projected change and confidence. Professional plan and above.
| Name | Required | Description | Default |
|---|---|---|---|
| code | Yes | PackIndex code, e.g. PP, KRLNR, OCC, GAS_TTF, CORR. Use search_indices if unsure. | |
| currency | No | Also show the value in this currency (ISO code, e.g. EUR, CAD). Defaults to the signed-in user's own currency; converted at live FX. |
get_index_historyGet index historyRead-onlyIdempotentInspect
Price history for any PackIndex code (L0-L3), one value per date: every point for up to 3 months, weekly closes for longer spans, with the change between points. Depth follows the caller's plan (observer 3mo · essential 3mo · professional 24mo · intelligence 24mo); free history ends 12 weeks ago.
| Name | Required | Description | Default |
|---|---|---|---|
| code | Yes | PackIndex code, e.g. PP, KRLNR, OCC, GAS_TTF, CORR. Use search_indices if unsure. | |
| months | No | Capped to the caller's plan depth. |
get_live_indexGet one index valueRead-onlyIdempotentInspect
Today's value of one PackIndex code — commodity inputs (L0: oil, gas, power, metals, recovered fibre), raw materials (L1: PP, HDPE, pulp…), semi-finished (L2: kraftliner, films…) or finished packs (L3) — in USD (and your currency), with 1-week / 1-month / 3-month / 1-year change (each period only where that much history exists) and carbon data where scored. Free callers get a 12-week delayed reference value (plus a daily live rotation); live values need the Essential plan.
| Name | Required | Description | Default |
|---|---|---|---|
| code | Yes | PackIndex code, e.g. PP, KRLNR, OCC, GAS_TTF, CORR. Use search_indices if unsure. | |
| currency | No | Also show the value in this currency (ISO code, e.g. EUR, CAD). Defaults to the signed-in user's own currency; converted at live FX. |
get_market_moversMarket moversRead-onlyIdempotentInspect
Biggest risers and fallers among inputs (L0), raw materials (L1) and semi-finished (L2) over 1w / 1m / 3m / 1y, optionally within a group (e.g. 'polymer', 'fibre', 'energy'). Essential plan and above.
| Name | Required | Description | Default |
|---|---|---|---|
| group | No | Optional group or name filter | |
| layer | No | all | |
| limit | No | ||
| period | No | 1w |
get_my_rfqsExchange: my RFQsRead-onlyIdempotentInspect
The user's sent RFQs with how many suppliers received each and how many responded; pass rfq_id for the responses (bids and, once a supplier responds, their contact).
| Name | Required | Description | Default |
|---|---|---|---|
| rfq_id | No |
get_pricesGet several index valuesRead-onlyIdempotentInspect
Today's values for up to 20 PackIndex codes in one call (any layer: oil, gas, resins, pulp, board, films, finished packs) with 1w/1m/3m/1y change — for watchlists and cost models. Free callers get 12-week delayed reference values.
| Name | Required | Description | Default |
|---|---|---|---|
| codes | Yes | PackIndex codes, e.g. ['PP','HDPE','KRLNR','GAS_TTF'] | |
| currency | No | Also show values in this currency (ISO code). |
list_my_projectsDesign Studio: my projectsRead-onlyIdempotentInspect
The user's Design Studio packaging projects (id, name, pack type, status) and Suite runs left. Use it before compare_packaging_options or post_rfq when the user refers to 'my project' without an id. Requires the user's OPN account.
| Name | Required | Description | Default |
|---|---|---|---|
No parameters | |||
packindex_queryAsk PackIndexRead-onlyIdempotentInspect
Ask a plain-English question about packaging costs, indices or which PACKIQ agent to use. Returns a structured, citable answer grounded in PackIndex data.
| Name | Required | Description | Default |
|---|---|---|---|
| currency | No | Answer currency; auto-detected from the question if omitted. | |
| question | Yes |
packiq_epr_feesPACKIQ: calculate EPR feesInspect
Estimate annual Extended Producer Responsibility fees for a packaging portfolio across active schemes (EU member states, UK, US states, Canada, Chile, Brazil): fee band per format, total liability by market and a reformulation priority list. Requires the user's OPN account; costs 4 PACKIQ credits (refunded automatically if the run fails).
| Name | Required | Description | Default |
|---|---|---|---|
| input | Yes | The packaging portfolio as text: formats, materials, unit weights, annual volumes and markets. |
packiq_quote_analysisPACKIQ: analyse a supplier quoteInspect
Benchmark every line of a pasted supplier packaging quote against live PackIndex finished-pack indices: deviation from the benchmark and a verdict per line (Sharp, Competitive, High, Overpriced), with market evidence for lines more than 8% above index. Requires the user's OPN account; costs 2 PACKIQ credits (refunded automatically if the run fails).
| Name | Required | Description | Default |
|---|---|---|---|
| input | Yes | The supplier quote as text: items, specs, quantities, unit prices and currency. |
packiq_recyclabilityPACKIQ: grade recyclabilityInspect
Grade a packaging structure on the EU PPWR recyclability scale (A to F) from its substrate, layers, inks, closures and adhesives: grade, reasoning, EPR eco-modulation impact and options to reach a higher grade. Requires the user's OPN account; costs 4 PACKIQ credits (refunded automatically if the run fails).
| Name | Required | Description | Default |
|---|---|---|---|
| input | Yes | The packaging structure as text: substrate, layers, inks, closures, adhesives and labels. |
post_rfqExchange: send an RFQInspect
Request quotes on the OPN Trade Exchange for a Design Studio project or a PackIndex material code to up to 3 suppliers. listing_ids (from find_suppliers) or, by default, the 3 best-matching listings get an RFQ — needs a verified e-mail and an Exchange plan with RFQs (Business+). company_slugs (converters from find_suppliers) ask those companies to quote; the Exchange contacts them for the buyer, anonymously. Real e-mails are sent — confirm the selection with the user first.
| Name | Required | Description | Default |
|---|---|---|---|
| unit | No | e.g. units, t | |
| notes | No | ||
| region | No | ||
| currency | No | USD | |
| quantity | No | ||
| broadcast | No | Also send to every live listing for the material | |
| needed_by | No | YYYY-MM-DD | |
| project_id | No | Design Studio project with a costed BoM | |
| listing_ids | No | Only these listings (from search_exchange_listings) | |
| material_id | No | PackIndex code, e.g. RSC_0201, KRLNR, PP | |
| target_price | No | ||
| company_slugs | No | Converters to ask for a quote (company_slug from find_suppliers) |
price_adjustmentIndex-linked price adjustmentRead-onlyIdempotentInspect
Recalculate an index-linked contract price: base price and base date plus the indices it follows and their weights (the rest is fixed). Returns the adjusted price, each index's ratio and effect, and the formula. Essential plan (base dates up to 3 months back), Professional (24 months).
| Name | Required | Description | Default |
|---|---|---|---|
| code | No | Shortcut for one index (with weight) | |
| weight | No | ||
| currency | No | Currency of the contract price (label only) | |
| base_date | Yes | YYYY-MM-DD the base price was agreed | |
| base_price | Yes | ||
| components | No | e.g. [{'code':'PP','weight':0.6},{'code':'GAS_TTF','weight':0.1}] | |
| adjustment_date | No | YYYY-MM-DD, default today |
search_exchange_listingsSearch Exchange listingsRead-onlyIdempotentInspect
Live supplier offers on the OPN Trade Exchange, filterable by PackIndex material code and origin, each with its PackIndex benchmark (live on paid plans, 12-week delayed otherwise). No contact details — RFQs happen on the Exchange.
| Name | Required | Description | Default |
|---|---|---|---|
| limit | No | ||
| query | No | Supplier name or keywords (grade, certification, city) | |
| region | No | Origin country or region, e.g. Canada, CA, North America | |
| material_id | No | PackIndex code, e.g. KRLNR, PP, BOPP |
search_indicesSearch PackIndex codesRead-onlyIdempotentInspect
Find PackIndex codes by material, input, format or plain words ('polypropylene', 'recovered paper', 'natural gas', 'kraftliner', 'corrugated box'). Returns published codes with layer (L0 inputs, L1 raw materials, L2 semi-finished, L3 finished packs), region and unit — no prices. Use first when you don't know the exact code.
| Name | Required | Description | Default |
|---|---|---|---|
| layer | No | Optional layer filter: L0 primary inputs, L1 raw materials, L2 semi-finished, L3 finished units. | |
| limit | No | ||
| query | Yes |
update_projectDesign Studio: update a projectDestructiveIdempotentInspect
Change a Design Studio project's order quantity, target region, contents size (boxes — enables right-sizing), name or performance floor (corrugated: ECT; folding cartons: bending stiffness in mN·m; rigid packs: top-load kgf). Free — no Suite run; a new quantity re-prices the existing bill of materials. Use it when the user gives the real volume before comparing options or requesting quotes.
| Name | Required | Description | Default |
|---|---|---|---|
| name | No | ||
| region | No | Target market or supply country | |
| quantity | No | Units per order / year | |
| project_id | Yes | ||
| contents_mm | No | Boxes: the product(s) as packed, 'L x W x H' in mm (3 balls of 74 mm in a row: '74 x 74 x 222'). Enables right-sizing. | |
| performance | No | Performance floor — use the pair that fits the pack. Downgauging is checked against the floor only when both current and required are given. |
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
6 tool updates
- Removed
get_agent_chain - Removed
list_packiq_agents - Added
packiq_epr_fees - Added
packiq_quote_analysis - Added
packiq_recyclability - Removed
run_packiq_agent
26 tool updates
- First observed
check_quote - First observed
compare_packaging_options - First observed
compare_regions - First observed
cost_packaging_spec - First observed
draft_packaging_spec - First observed
estimate_packaging_price - First observed
explain_price_move - First observed
find_suppliers - First observed
get_agent_chain - First observed
get_all_indices - First observed
get_carbon_index - First observed
get_index_forecast - First observed
get_index_history - First observed
get_live_index - First observed
get_market_movers - First observed
get_my_rfqs - First observed
get_prices - First observed
list_my_projects - First observed
list_packiq_agents - First observed
packindex_query - First observed
post_rfq - First observed
price_adjustment - First observed
run_packiq_agent - First observed
search_exchange_listings - First observed
search_indices - First observed
update_project
Related MCP Connectors
Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.
Find, size, price and order packaging: boxes, mailers, poly bags, tape. Live price and stock.
- AuraVMSOAuthcom.auravms
Procurement: manage suppliers, send RFQs, compare supplier quotes and place purchase orders.
Related MCP Servers
- FlicenseNot gradedqualityDmaintenanceConnects Hermes to procurement pricing tools for BOM review, mock market data, cost calculations, and Excel report generation.-
- FlicenseNot gradedqualityCmaintenanceEnables users to retrieve supplier catalog and price-history data, and to write comparison sheets through MCP tools.-
- AlicenseAqualityAmaintenanceEnables creating and managing packing slips for shipments, tracking cartons, contents, weights, chargeable weight, and shortfalls, with reports and packing slip generation.14MIT
- FlicenseNot gradedqualityCmaintenanceAn MCP server designed to automate tender and RFQ pricing by extracting requirements from documents and building structured pricing models. It enables users to calculate final costs, compare market rates, and generate styled HTML pricing reports for PDF export.-
Glama MCP Gateway
Add one secure layer between your agents and this server.