Run one of the four preset scenarios (single, coffee, grocery, callcenter) with optional overrides. Overrides apply UNIFORMLY across open hours — e.g. setting servers=5 on 'coffee' replaces the 4/6/4 staffing pattern with a flat 5 during open hours (closed hours stay at zero). Use this for (a) faithful reproduction of a scenario's defaults, or (b) uniform scaling (everywhere it was open, use these new numbers). Do NOT use this when the user wants to keep a scheduled scenario's shape but tweak just one part — there's no per-hour override here, and collapsing a 4/6/4 pattern to 5 often isn't what the user meant. For flat what-if analysis on scheduled scenarios, prefer simulate_mmc using peak params from describe_scenario. ANTI-FABRICATION: returned numbers come from a real discrete-event simulation run. Quote them VERBATIM in your reply. Do not round, estimate, or compute derived figures from training-data recall. If the user asks a follow-up about the same scenario+overrides, re-call this tool rather than recalling numbers from earlier in the conversation.
Connector