Skip to main content
Glama
archicad-ai

archicad-ai

by vietcad-com

price_walls

Price walls by wall type using takeoff areas and your rates, then export a cost table to Excel. Deducts openings, applies rate spreads and height overrides.

Instructions

Cost table per wall type from the last wall_takeoff. Read-only. rates: {"": mid_rate} or {"": [low, mid, high]} in currency per m2. area_basis: "net" (openings deducted) or "gross". spread_pct: low/high = mid -/+ this % when only one rate is given. height_override_m: {"": height} rescales that type's area to the given height. Writes an Excel file (Cost table, Walls, Assumptions) and returns its path.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "rates": "<rates>"
    },
    "name": "price_walls"
  }
}

Input Schema

NameRequiredDescriptionDefault
ratesYes
currencyNoUSD
area_basisNonet
spread_pctNo
assumptionsNo
exclude_typesNo
project_labelNo
height_override_mNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

A3.7/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full burden, and it does disclose the key side effect: it writes an Excel file with named sheets and returns the path, plus declares 'Read-only' relative to the project model. It omits whether an existing file is overwritten, where the file is written, and any failure modes, so transparency is good but incomplete.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Purpose is front-loaded in the first line, then parameter semantics are presented as labelled fragments, each of which earns its place. There is no filler or repetition of schema defaults.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For an 8-parameter tool with no annotations and no output schema, the definition covers the return value (file path plus sheet names) and the tricky inputs. What remains missing is output location/overwrite behavior and the meaning of the unmentioned parameters, which is a modest but real gap.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 0%, so the description must compensate, and it explains the four non-obvious parameters well: the two accepted 'rates' shapes, the 'net' vs 'gross' area_basis values, how spread_pct derives low/high from mid, and what height_override_m rescales. It says nothing about currency, assumptions, exclude_types, or project_label, though those are largely self-describing by name.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a concrete output (a cost table per wall type) and its data source (the last wall_takeoff), which is enough to distinguish it from the sibling wall_takeoff that produces the input. It stops short of explicitly contrasting itself with siblings, but the verb+resource combination is unambiguous.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

'from the last wall_takeoff' implies a prerequisite ordering (takeoff must run first), which is useful implicit guidance. However, there is no explicit statement of when to prefer this tool over alternatives, no exclusions, and no note on what happens if no prior takeoff exists.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.