update_adjustment_line_item
Updates an existing adjustment line item in a project, allowing changes to amount, sort order, reference code, or description.
Instructions
Update an existing adjustment line item within a project.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"collectionId": "<collectionId>",
"id": "<id>"
},
"name": "update_adjustment_line_item"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | The adjustment line item ID | |
| amount | No | Amount (positive = debit, negative = credit) | |
| ordinal | No | Sort order within the adjustment | |
| reference | No | Reference code or identifier | |
| description | No | Description/memo for this line item | |
| collectionId | Yes | The project ID |