calc_reorder_point
Calculate reorder point by multiplying average demand per period by lead time periods and adding safety stock to ensure inventory availability.
Instructions
Calculates reorder point = (avgDemandPerPeriod * avgLeadTimePeriods) + safetyStock. DEPENDS ON: calc_safety_stock's output (or an equivalent safetyStock value) and the same demand/lead-time inputs — ultimately sourced from get_goods_movement_history, which is currently blocked (see that tool's file).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| safetyStock | Yes | ||
| avgDemandPerPeriod | Yes | ||
| avgLeadTimePeriods | Yes |