Move the expected signal date
forbiz_postponePush back a signal's expected date in Forbiz CRM by providing the signal ID and a new expectedSignalAt ISO 8601 timestamp; add an optional reason.
Instructions
Push the date the signal is expected (POST /actions/{id}/postpone).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | ||
| reason | No | ||
| expectedSignalAt | Yes | ISO 8601 date-time, e.g. 2026-10-15T14:00:00Z |