Generate Estimate Cost
generate_estimate-costEstimate the credit cost of a video generation before creating it. Provide model and duration to get an upfront cost for accurate budgeting.
Instructions
Estimate the credit cost of a generation before creating it. Takes the same body as generate_create-generation.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| fps | No | ||
| model | Yes | ||
| duration | Yes | ||
| reasoningEnabled | No |