Skip to main content
Glama
Incident Lake MCP

Incident Lake MCP

Official
by sigq-io

update_task_board_project

DestructiveIdempotent

Updates an existing task board project's name, description, color, WIP limits, or planning setting while leaving unspecified fields unchanged.

Instructions

Update a task board project. Only the fields given are changed.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "projectId": "<projectId>"
    },
    "name": "update_task_board_project"
  }
}

Input Schema

NameRequiredDescriptionDefault
nameNoProject name
colorNoHex color (default #6366f1)
projectIdYesTask board project UUID
wipLimitsNoWIP limit per status, e.g. {"in_progress": 3}; null or 0 removes a limit
descriptionNoProject description
planningEnabledNoEnable scopes and the timeline (default false)

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.1.0

TDQS

B3.4/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

The annotations already declare readOnlyHint=false, idempotentHint=true, and destructiveHint=true. The description adds useful partial-update semantics with 'Only the fields given are changed,' but it does not explain what is destructive, what permissions are required, or what happens to existing fields that are overwritten. With annotations covering the safety profile, this is an appropriate but limited addition.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is two short sentences, front-loaded with the action and followed by the most important behavioral constraint. Every sentence earns its place, and there is no unnecessary wording.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The schema is rich with 100% parameter description coverage and the annotations cover safety traits, so much of the context is supplied structurally. However, for a destructive update tool with nested WIP-limit configuration and no output schema, the description omits when-to-use guidance and does not elaborate on destructive effects or prerequisites. It is adequate but has clear gaps.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema already documents each parameter in detail. The description adds meaningful semantics beyond the schema by clarifying that omitted fields are left unchanged, which is important for a partial-update tool with only projectId required. This goes beyond simply restating parameter names.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource: 'Update a task board project.' It clearly distinguishes the project resource from task or scope resources by name, though it does not explicitly call out sibling alternatives. This is clear but lacks explicit sibling differentiation.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description provides no when-to-use guidance, no when-not-to-use exclusions, and no alternatives. It implies that the tool is used to update a project but does not explain how to choose between this and siblings such as update_task_board_scope or update_task_board_task.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools