Skip to main content
Glama
MCP ERPNext
by sharat9703

erpnext_create_taiga_tasks

Create one or more Taiga tasks under a User Story, resolve assignees from project members, set complexity and task type attributes when available, and return created task IDs plus failures.

Instructions

Create one or more tasks in Taiga under a given User Story. Resolves assignees from project members and sets custom attributes (complexity, task_type) when those attributes exist on the project. Returns created task refs/ids and any failures.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "user_story_id": "<user_story_id>",
      "project_slug": "<project_slug>",
      "tasks": "<tasks>"
    },
    "name": "erpnext_create_taiga_tasks"
  }
}

Input Schema

NameRequiredDescriptionDefault
tasksYesTasks to create under the user story.
statusNoTask status name to apply to all created tasks (e.g. "Closed", "In progress"). Defaults to the project default (usually "New").
project_slugYesTaiga project slug the tasks belong to (e.g. "rupay-card").
user_story_idYesNumeric Taiga User Story id (from erpnext_validate_user_story).

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

A3.6/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With no annotations, the description carries the full burden and does disclose useful mechanics: assignee names are resolved against project members, custom attributes are only applied when they exist on the project, and failures are reported alongside successes. It does not say whether creation is atomic or per-task best-effort, what permissions are needed, or whether retries create duplicates.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three sentences, front-loaded with the create action and scope, then side-effect semantics, then return shape. No filler or restated field names.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The tool is a batch mutation with no annotations and no output schema, so the description should explain the return contract more precisely; 'created task refs/ids and any failures' is directionally right but vague about structure and partial-failure semantics. It also omits any guidance on large batches or limits.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the schema already documents every parameter. The description still adds meaning beyond it by explaining the conditional behavior behind assignee and custom-attribute fields (resolution against project members, attributes applied only if present) and the batch shape of the tasks array.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource ('Create one or more tasks in Taiga') plus scope ('under a given User Story'), which is unambiguous. It does not distinguish itself from the sibling erpnext_create_tasks_from_analysis, so an agent must infer the boundary from the name alone.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is implied by the description's scope (creating under an existing User Story), but there is no explicit statement of when to pick this tool over erpnext_create_tasks_from_analysis or erpnext_update_taiga_task. No prerequisites or exclusions are given.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.