Add steps to a task
planAdd ordered steps to an open task, appending them after existing steps so an AI agent can structure work and track progress. Use read to review current steps first.
Instructions
Add steps to an open task, after those already there (read shows them). One done on its own is a part: propose with part_of.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"task": "<task>",
"steps": "<steps>"
},
"name": "plan"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| task | Yes | The task id | |
| steps | Yes | The steps to add, in order, each at most 100 characters |