list_time_blocks
Retrieve individual time blocks between two inclusive dates (max 92 days) with start/end times, duration, project, task, and memo for detailed schedule review.
Instructions
The individual time blocks logged between two dates (inclusive, max 92 days), with start/end times, duration, project, task and memo. This is the detailed schedule; use time_summary when you only need totals. Requires blocks:read.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| date_to | Yes | YYYY-MM-DD (inclusive). | |
| date_from | Yes | YYYY-MM-DD (inclusive). |