tasks_move
Move a task or subtask to a new parent and renumber its subtree, optionally setting its position to keep project hierarchy consistent.
Instructions
Move an item to another parent (renumbers the subtree). Errors: unknown ids, moving a sprint, moving into own subtree, depth > MAX_DEPTH, same parent without --pos.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"id": "<id>",
"new_parent": "<new_parent>"
},
"name": "tasks_move"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | Item id: sprint '1', task '1.2', subtask '1.2.3' | |
| pos | No | 1-based position (default: append last) | |
| new_parent | Yes | New parent id |