Skip to main content
Glama

Request the mission report

plune_report_request

Request a mission completion report built from platform data and queued for human approval; an accepted strategy is required first.

Instructions

Ask the platform to build the completion report of a mission from its own data and queue it for a person to approve; it needs an accepted strategy first.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "missionId": "<missionId>"
    },
    "name": "plune_report_request"
  }
}

Input Schema

NameRequiredDescriptionDefault
dry_runNotrue: answer what would be sent, and send nothing
missionIdYesThe mission id

Output Schema

NameRequiredDescriptionDefault
dryRunYes
resultNo
requestNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.39.8

TDQS

A3.9/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations declare non-read-only, non-destructive, non-open-world, but the description adds the behavior that matters: the report is generated from the platform's own mission data (no external input), and the operation only queues work for a person to approve rather than producing a final report. That discloses the asynchronous, approval-gated nature the annotations cannot express. It says nothing about permissions, latency, or what happens on a duplicate request.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single sentence with the action front-loaded and the prerequisite appended at the end. It is dense but every clause carries information. A slight structural improvement would be separating the precondition into its own sentence.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema exists, so return values need not be explained, and the description covers the action, the data source, the human-approval outcome, and the strategy prerequisite. The only gap is what an agent should expect between request and approval, but that is largely a return-value concern handled by the output schema.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% and both parameters carry descriptions, including dry_run's 'answer what would be sent, and send nothing' semantics. The description adds no parameter-level meaning beyond that, so the baseline 3 applies.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource: build the completion report of a mission from platform data and queue it for human approval. That is far more precise than the name alone and no sibling tool generates reports, so an agent can tell what it does. It stops short of explicitly contrasting itself with the review/approval siblings (plune_review_list, plune_review_decide), which would have made it a 5.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives a clear precondition for use: an accepted strategy must already exist. That is a real gating rule an agent needs. It offers no explicit when-not guidance or named alternatives, so it falls short of a 5.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.