Skip to main content
Glama
NOVTRIQ Engineering

NOVTRIQ Engineering

Official

NOVTRIQ Engineering Intelligence MCP

An MCP (Model Context Protocol) server exposing 24 engineering intelligence tools for building energy and carbon, HVAC, UK building regulations, Eurocode structural and cost, cyber and certification, and UAE compliance.

This repository is the open, self-hostable catalogue face of the NOVTRIQ MCP. It advertises the full tool set so any MCP client or aggregator can discover it, and it forwards tool execution to the authoritative hosted endpoint. The engineering calculators themselves run on the hosted service.

  • Hosted endpoint: https://api.novtriq.tech/mcp (streamable-http, keyless free tier)

  • Transport: JSON-RPC 2.0 over HTTP

  • Tools: 24

  • Provider: NOVTRIQ, UK engineering intelligence

Use the hosted server directly

Most clients should point straight at the hosted endpoint. Example MCP client config:

{
  "mcpServers": {
    "novtriq-engineering": {
      "url": "https://api.novtriq.tech/mcp"
    }
  }
}

The free tier is keyless (5 requests/minute, 500/month per address). Higher tiers and API keys are available at https://novtriq.tech/eaas.

Related MCP server: security-orchestra

Run this catalogue server locally

pip install -r requirements.txt
uvicorn server:app --host 0.0.0.0 --port 8080

Or with Docker:

docker build -t novtriq-engineering-mcp .
docker run -p 8080:8080 novtriq-engineering-mcp

Then:

curl -s -X POST http://localhost:8080/mcp \
  -H 'Content-Type: application/json' \
  -d '{"jsonrpc":"2.0","id":1,"method":"tools/list"}'

initialize, tools/list, resources/list and prompts/list are answered locally. tools/call is forwarded to the hosted endpoint (override with the NOVTRIQ_MCP_UPSTREAM environment variable).

Tool catalogue

HVAC

estimate_cooling_load (CIBSE Guide B2 / ASHRAE 90.1)

Building energy, carbon and EPC

assess_epbd_score (EU 2024/1275), calculate_carbon (CIBSE TM65 / RICS WLCA), building_carbon_footprint (CRREM), sap_sbem_precheck (UK SAP 10.3 / SBEM), mees_checker, heatpump_heatloss (BS EN 12831 / MCS), digital_renovation_passport, building_readiness

UK building regulations

part_o_overheating (Approved Document O), part_s_ev (Approved Document S), uk_planning_checker (GPDO 2015)

Structural and cost

eurocode_beam_designer (EC3 / EC2), eurocode_column_checker (EC3), eu_cost_benchmarking, get_technical_dd_quote (RICS / CIBSE), roi_calculator

Cyber and certification

check_nis2_readiness (EU 2022/2555), dgnb_bim_readiness (ISO 19650), contractor_vetting

UAE

check_uae_bim_compliance (Dubai Circular 196, ISO 19650), check_uae_cybersecurity (NESA / Dubai ISR / CBUAE / TDRA), check_grid_feasibility_uae (DEWA / ADDC / SEWA / FEWA), uae_climate_ghg (Federal Decree-Law No. 11 of 2024)

The full JSON Schema for every tool is in tools.json.

Notes

Tool outputs are indicative engineering estimates and should be validated by a qualified engineer against current standards and site specific data.

License

MIT. See LICENSE.

Available Tools

27 tools
assess_epbd_scoreC

Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures.

Inputs: country (required), year_built (required), current_epc (required), has_solar_pv (required), +3 more.

building_carbon_footprintC

Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions.

Inputs: location (required), year_built (required), building_type (required), floor_area_m2 (required), +6 more.

building_readinessB

Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations.

Inputs: bim (required), floors (required), location (required), condition (required), +4 more.

calculate_carbonB

Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback.

Inputs: country (required), building_type (required), floor_area_m2 (required), energy_kwh_year, +1 more.

calculate_pueA

Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations.

Inputs: cooling_kw (required), it_load_kw (required), lighting_kw (required), ups_losses_kw (required).

check_grid_feasibility_uaeA

Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps.

Inputs: intended_use (required), site_location (required), voltage_level (required), has_existing_supply (required), +2 more.

check_nis2_readinessA

Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions.

Inputs: sector (required), has_ciso (required), has_ir_plan (required), has_ot_policy (required), +7 more.

check_uae_bim_complianceA

Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist.

Inputs: emirate (required), has_bep (required), ifc_export (required), bim_software (required), +4 more.

check_uae_cybersecurityA

Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls.

Inputs: emirate (required), has_isms (required), is_cloud_hosted (required), organisation_type (required), +4 more.

contractor_vettingA

NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligence report.

Inputs: answers (required), purpose.

dgnb_bim_readinessA

DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit.

Inputs: answers (required), cert_target.

digital_renovation_passportA

EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative.

Inputs: heating (required), current_epc (required), floor_area_m2 (required), era, +3 more.

eed_datacentre_packA

EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mandates reporting, not target values.

Inputs: it_power_kw (required), it_energy_kwh (required), total_energy_kwh (required), water_input_m3, +2 more.

estimate_cooling_loadC

Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy.

Inputs: it_load_kw (required), redundancy (required), space_type (required), climate_zone (required), +2 more.

eu_cost_benchmarkingA

Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against current cost indices.

Inputs: country (required), project_type (required), floor_area_m2 (required), bim, +3 more.

eurocode_beam_designerA

Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design.

Inputs: config (required), span_m (required), material (required), udl_kn_m (required), +5 more.

eurocode_column_checkerA

Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design.

Inputs: material (required), axial_load_kn (required), effective_length_m (required), section, +5 more.

get_technical_dd_quoteB

Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA.

Inputs: geography (required), disciplines (required), building_type (required), gross_area_m2 (required), +2 more.

heatpump_heatlossA

Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP and annual demand. Typical U-values/SCOP, not measured.

Inputs: age_band (required), location (required), floor_area_m2 (required), storeys, +6 more.

mees_checkerA

England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory only. Returns compliance, can-let, cost cap and penalties.

Inputs: property_type (required), current_epc_band (required).

part_o_overheatingA

UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM59 modelling if it fails. Indicative.

Inputs: floor_area_m2 (required), location_risk (required), glazing_area_m2 (required), most_glazed_facade (required), +2 more.

part_s_evA

UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power and the applicable cost caps/exemptions. Indicative.

Inputs: works (required), building_type (required), parking_spaces (required), dwellings, +1 more.

roi_calculatorB

Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict.

Inputs: team_size (required), hourly_rate (required), manual_hours (required), efficiency_gain_pct (required), +2 more.

sap_sbem_precheckA

UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full SAP/RdSAP assessment.

Inputs: sap_rating, floor_area_m2, annual_energy_kwh.

thermal_loadB

Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison.

Inputs: it_load_kw (required), redundancy (required), cooling_type (required), room_area_m2 (required), +3 more.

uae_climate_ghgA

UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confidence caveats.

Inputs: emirate (required), electricity_kwh (required), gas_m3, gas_kwh.

uk_planning_checkerA

UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Article 4, conservation area, AONB). Indicative, verify with the LPA.

Inputs: proposal (required), property_type (required), listed, location, +6 more.

Tool Schema Changelog

Recent tool additions, removals, and schema changes observed during successful MCP inspections.

Loading tool schema changelog…

    TDQS

    C2.9/5.0

    Scored across 27 tools

    Disambiguation2/5

    Several tools have overlapping purposes: calculate_carbon and building_carbon_footprint both assess carbon; thermal_load and estimate_cooling_load both size cooling; check_nis2_readiness and contractor_vetting both address NIS2. Despite detailed descriptions, an agent would struggle to distinguish these near-synonyms, causing potential misselection.

    Naming Consistency2/5

    Tool names mix noun phrases (eurocode_column_checker, digital_renovation_passport) with verb phrases (calculate_pue, get_technical_dd_quote) and even noun_tool patterns (roi_calculator). Verbs are inconsistent (check, assess, calculate, estimate, get), making the naming unpredictable.

    Tool Count2/5

    27 tools is excessive for a single server, especially with redundant coverage of carbon, cooling, and cybersecurity. Several tools could be consolidated (e.g., calculate_carbon and building_carbon_footprint), suggesting the count is inflated beyond a coherent scope.

    Completeness2/5

    While covering many regulations, the set lacks tools for entire engineering disciplines (e.g., UK Part L, acoustics, fire safety) and has no way to consolidate results. The redundancies also indicate gaps in other areas, making the surface incomplete for a general engineering toolkit.

    Maintenance

    ActivityMaintained
    ResponsivenessNo recent community issues

    Related MCP Connectors

    Related MCP Servers

    • A
      license
      Not graded
      quality
      D
      maintenance
      53 regulatory compliance evidence tools across 3 MCP servers for AI agents. MiCA authorization status, DORA evidence packs, stablecoin risk scoring (105+ tokens), macro intelligence (86 FRED series). Every response ECDSA-signed (ES256K), blockchain-anchored, audit-ready. Free tier, OAuth 2.0.
      MIT
    • F
      license
      Not graded
      quality
      C
      maintenance
      Provides deterministic, standards-based calculations for data center critical power infrastructure. Enables site selection, generator sizing, UPS sizing, NFPA 110 compliance, and more via 50+ AI agents and 8 compound chains.
      -
    • A
      license
      Not graded
      quality
      C
      maintenance
      Enables MCP clients such as Claude, Copilot and IDE agents to interrogate a building's digital twin in plain language through seven tools covering building overview, room lists, per-room design promises, diagnosed findings, room time series, sandboxed read-only SQL and BCF issue export. Answers whether each room still meets its own design intent — and why not — instead of relying on fixed thresholds.
      MIT
    • A
      license
      A
      quality
      C
      maintenance
      Enables AI agents to run deterministic data-center engineering calculations and commissioning audits, including liquid-cooling hydraulics, pipe friction and flow checks, corrosion severity classification, protocol search, and defect-code lookup.
      6
      2
      MIT