Skip to main content
Glama

Unlink Milestone from Project

codecks_unlink_milestone_project

Unlink a project from a Codecks milestone and optionally convert the milestone to global when removing its final linked project.

Instructions

Remove an existing milestone-project link. To unlink the final project from a non-global milestone, set globalize_if_last_project=true.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "milestone_id": "<milestone_id>",
      "project_id": "<project_id>"
    },
    "name": "codecks_unlink_milestone_project"
  }
}

Input Schema

NameRequiredDescriptionDefault
project_idYesProject ID to unlink from milestone
session_idNo[DEPRECATED] Client session ID - not required for MCP usage
milestone_idYesMilestone ID to update
response_formatNoOutput format: 'markdown' for human-readable or 'json' for structured datamarkdown
globalize_if_last_projectNoAllow converting a non-global milestone to global when unlinking its final project

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.0

TDQS

A3.6/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare openWorldHint=true and readOnlyHint=false, so the write nature is known; the description adds the meaningful edge case that unlinking the last project of a non-global milestone requires an opt-in flag. However it never says what happens when that flag is false and it is the last project (error? no-op?), and 'remove' sits slightly at odds with destructiveHint=false since the call deletes a relationship. That is a tension to note rather than a direct contradiction, as re-linking can restore state.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two short sentences, front-loaded with the action and followed by the one non-obvious caveat. No filler, no repetition of the title.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a simple relationship-removal tool with full schema coverage, annotations, and no output schema, the definition covers the action and its trickiest edge case. It falls short only on the failure behavior when the last-project condition is unmet, which an agent would want before calling.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so all five parameters are already documented. The description restates the meaning of globalize_if_last_project in condition form, adding only marginally beyond the schema's own wording, and says nothing about project_id, milestone_id, or response_format. Baseline 3 applies when the schema carries the semantics.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

"Remove an existing milestone-project link" states a specific verb (remove) and resource (milestone-project link), which clearly separates it from the create/get/list milestone_project siblings. It does not explicitly name an alternative, but the operation is unambiguous from the text alone.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The second sentence gives a conditional trigger for the globalize_if_last_project flag, which is useful usage context but is really parameter guidance rather than when-to-use guidance. There is no statement of prerequisites, when-not to use it, or which sibling to reach for instead (e.g., delete_milestone vs unlink).

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools