iso9000-agentops-mcp
Server Configuration
Describes the environment variables required to run the server.
| Name | Required | Description | Default |
|---|---|---|---|
| ISO9000_GATE_SECRET | No | Workspace-local HMAC key used to sign the Human Gate 1 approval seal (alternative to `.supergraph/.gate_secret`). Optional; if neither is present, the server falls back to its default behavior. |
Instructions
Guidance the server publishes about itself, which clients place ahead of the tool catalog so the model reads it before choosing anything.
This server publishes no instructions, or was last inspected before Glama recorded them.
Capabilities
Features and capabilities supported by this server
Protocol revision2025-11-25
| Capability | Details |
|---|---|
| tools | {
"listChanged": false
} |
Tools
Functions exposed to the LLM to take actions
| Name | Description |
|---|---|
| iso9000_init_baselineC | Initialize an ISO 9001:2015 / Agile V frozen baseline and risk matrix. |
| iso9000_approve_gate1B | Approve Human Gate 1 and write a cryptographic HMAC-SHA256 seal. |
| iso9000_set_phaseC | Transition Agile V state machine phase and emit role-isolated subagent brief. |
| iso9000_verify_oracleC | Run independent verification oracle, record W3C PROV-DM EvidenceUnit, or trigger Planarian rollback. |
| iso9000_get_audit_chainB | Retrieve the current W3C PROV-DM SHA-256 audit chain and state summary. |
| iso9000_run_capaC | Execute Echelon 6 CAPA / ExpeL rule consolidation and Trace2Skill extraction. |
| iso9000_traceability_matrixC | Build bidirectional Agile V Requirements Traceability Matrix (RTM) and Markdown report. |
| iso9000_fmea_42001_assessC | Compute ISO 31000 FMEA RPN profile and ISO/IEC 42001:2023 Statement of Applicability. |
| iso9000_issue_certificateC | Issue HMAC-SHA256 quality certificate, SVG badge, and OASIS SARIF 2.1.0 report. |
| iso_certify_portfolioC | Certify multi-repository ecosystem portfolio, aggregating RTM coverage, max FMEA RPN, SoA controls, and Merkle tree root. |
Prompts
Interactive templates invoked by user choice
| Name | Description |
|---|---|
No prompts | |
Resources
Contextual data attached and managed by the client
| Name | Description |
|---|---|
No resources | |
TDQS
Scored across 10 tools
Each tool maps to a recognizable stage of the ISO 9001/Agile V pipeline (init, phase transition, gate approval, RTM, FMEA/SoA, CAPA, oracle verification, audit chain, certificate issuance, portfolio certification). The main overlap is between iso9000_issue_certificate and iso_certify_portfolio, which both produce certification artifacts, and between iso9000_traceability_matrix and the RTM-coverage aggregation inside iso_certify_portfolio. Descriptions are specific enough that an agent can usually pick correctly, but those two pairs invite misselection.
Most tools follow a clean iso9000_verb_noun pattern (issue_certificate, approve_gate1, get_audit_chain, init_baseline, run_capa, set_phase, verify_oracle). However iso_certify_portfolio breaks the iso9000_ prefix, and iso9000_fmea_42001_assess inverts the order to noun_verb with an embedded standard number, while iso9000_traceability_matrix is a bare noun. The set is readable but has visible convention drift.
Ten tools is a well-scoped size for a multi-stage compliance/audit lifecycle. Each tool corresponds to a distinct phase of the workflow, so none feels gratuitous or missing at the count level.
The surface covers the core lifecycle: baseline initialization, phase state machine, gate approval, RTM, risk/SoA assessment, CAPA, independent verification with rollback, audit chain retrieval, and certification. Minor gaps remain: only Gate 1 approval exists (later human gates appear unsupported), and there is no tool to read back, verify, or revoke an issued certificate. These are workaroundable but noticeable for a certification-focused server.