link_task_note
Link a note to a task while keeping the note in your inbox. The note and task maintain a live bidirectional link, so you avoid deleting notes after creating tasks.
Instructions
Link an existing note to a task (non-destructive, N-N). The note stays in the inbox/notes list and the task keeps a live link back to it — use this instead of deleting a note after creating a task from it. The note shows its linked tasks; the task shows the source note.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| note_id | Yes | Note UUID | |
| task_id | Yes | Task UUID |