kiem_tra_lod
Validates Level of Development (LOD) 100–500 for each IFC element by project stage and discipline, helping identify model detail gaps before audits.
Instructions
Kiểm tra LOD (Level of Development) 100–500 từng element theo stage và discipline.
Args: ifc_path: Đường dẫn đầy đủ tới file IFC stage: TKCS / TKKT / TKTC / AS-BUILT discipline: KT / KC / MEP / ALL project: Tên dự án (tự nhận diện nếu để trống)
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"ifc_path": "<ifc_path>"
},
"name": "kiem_tra_lod"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| stage | No | TKKT | |
| project | No | ||
| ifc_path | Yes | ||
| discipline | No | ALL |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| result | Yes |