update-checklist-item
Update an existing checklist item (subtask) in Microsoft To Do by changing its text or completion status. Use list, task, and checklist item IDs to identify the item to modify.
Instructions
Update an existing checklist item (subtask). Allows changing the text content or completion status of the subtask.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"listId": "<listId>",
"taskId": "<taskId>",
"checklistItemId": "<checklistItemId>"
},
"name": "update-checklist-item"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| listId | Yes | ID of the task list | |
| taskId | Yes | ID of the task | |
| isChecked | No | Whether the item is checked off | |
| displayName | No | New text content of the checklist item | |
| checklistItemId | Yes | ID of the checklist item to update |