Edit an existing video
flow_editPerform video-to-video edits on clips already in a Flow project by changing lighting, weather, background, or objects with prompts; queues the job and spends credits, so confirm cost before use.
Instructions
Video-to-video edit of a clip already in the Flow project (relight, change weather/background, remove or restyle objects) using Flow's edit view. Queued like a generation; use flow_wait for the file. Spends credits without a prior quote (about 20 for a 4 s clip), so ask the user before calling.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"project": "<project>",
"asset": "<asset>",
"prompt": "<prompt>",
"acknowledge_cost": "<acknowledge_cost>"
},
"name": "flow_edit"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| asset | Yes | Title (or title prefix) of a video already in the Flow project; see flow_assets. | |
| prompt | Yes | What to change, e.g. 'change the time of day to golden hour', 'remove the cup', 'make it snow'. | |
| project | Yes | Local folder for the edited clip. | |
| acknowledge_cost | Yes | Must be true. Flow shows no quote for edits, so max_credits cannot protect you: a 4 s clip cost 20 credits when measured. The real cost is reported on the finished job. | |
| download_quality | No |