Skip to main content
Glama

Set the charging schedule

bluelink_set_charging_schedule

Turn scheduled off-peak charging on or off and set its start and end times for a vehicle; omitted settings keep their current values.

Instructions

Change the car's scheduled (off-peak) charging: on or off, and the off-peak window. Settings left out keep their current values, read from the car's last reported state; the result shows the whole schedule that was sent. EVs and plug-in hybrids in Europe, Australia, New Zealand, China and India.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "bluelink_set_charging_schedule"
  }
}

Input Schema

NameRequiredDescriptionDefault
waitNoWait (up to ~60 s) for the car to confirm the command. If it hasn't by then, the status is pending: check later with bluelink_get_command_status.
vehicleNoVehicle name, VIN or ID. Optional if the account has one vehicle.
off_peak_endNo24-hour local time, HH:MM. Leave out to keep it as is.
off_peak_onlyNoCharge only in the off-peak window (true), or prefer it but charge outside it when needed (false). Leave out to keep it as is.
off_peak_startNo24-hour local time, HH:MM. Leave out to keep it as is.
scheduled_chargingNoTurn scheduled charging on or off. Leave out to keep it as is.

Output Schema

NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations only say it is a non-read-only, non-destructive, open-world write. The description adds meaningful behavior: omitted fields are read from the car's last reported state, and the result echoes the whole schedule sent. It does not discuss confirmation latency, but that is covered by the wait parameter's schema text.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three compact sentences, front-loaded with the action and its scope, then the partial-update rule, then the regional constraint. No filler, though the regional caveat could be tighter.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema exists, so return values need not be explained, and annotations plus 100% schema coverage carry the rest. The definition covers scope, partial-update semantics and region gating; the only gap is guidance versus sibling tools for immediate charging.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so baseline is 3. The description goes slightly beyond by stating the omit-to-keep semantics that governs off_peak_start, off_peak_end, off_peak_only and scheduled_charging as a group, which the per-parameter schema text only repeats individually.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description uses a specific verb+resource: "Change the car's scheduled (off-peak) charging: on or off, and the off-peak window." That distinguishes it well from siblings like bluelink_set_charge_limits and bluelink_start_charging, though it does not name any sibling explicitly.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives real usage context: the partial-update rule ("Settings left out keep their current values") and a hard applicability constraint (EVs/PHEVs in Europe, Australia, New Zealand, China, India). It does not name alternatives such as starting immediate charging, so it stops short of full when/when-not routing.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.