Skip to main content
Glama

Server Configuration

Describes the environment variables required to run the server.

NameRequiredDescriptionDefault

No arguments

Instructions

Guidance the server publishes about itself, which clients place ahead of the tool catalog so the model reads it before choosing anything.

This server publishes no instructions, or was last inspected before Glama recorded them.

Capabilities

Features and capabilities supported by this server

Protocol revision2025-11-25

CapabilityDetails
tools
{
  "listChanged": false
}
prompts
{
  "listChanged": false
}
resources
{
  "subscribe": false,
  "listChanged": false
}

Tools

Functions exposed to the LLM to take actions

NameDescription
plan_createB

Create a new plan and write it to .opencode/plan.md.

Args: steps: List of step descriptions to add to the plan.

Returns: A message reporting the number of created steps on success, or an error message on failure.

plan_nextA

Activate the next pending plan step ([~]) and return it.

Returns: The ID and text of the next step; an error message if a lock is already active or the plan file is missing; 'PLAN_DONE' when all steps are done.

plan_doneB

Mark the active [~] step as completed [x] and append a note.

Args: id: ID of the completed step. note: Short completion note to append to the step.

Returns: A success or error message.

plan_failB

Mark the active [~] step as failed [!] and append a reason.

Args: id: ID of the failed step. reason: Reason for the failure.

Returns: A success or error message.

Prompts

Interactive templates invoked by user choice

NameDescription

No prompts

Resources

Contextual data attached and managed by the client

NameDescription

No resources

TDQS

A3.7/5.0

Scored across 4 tools

Disambiguation5/5

Each tool maps to a distinct action in the plan lifecycle: create the plan, activate the next step, mark the active step done, or mark it failed. There is no meaningful overlap, and the descriptions make the boundaries clear.

Naming Consistency5/5

All tools use the same predictable pattern: `plan_` followed by a short verb (`create`, `next`, `done`, `fail`). The convention is consistent throughout.

Tool Count5/5

Four tools are sufficient for this narrow plan-lock workflow, and each tool has a clear role. The surface is well-scoped rather than padded or thin.

Completeness4/5

The core lifecycle is covered: create a plan, activate the next step, and complete or fail it. However, there is no explicit tool to inspect the full plan/status, reset a stuck lock, or retry a failed step, leaving minor gaps.

Maintenance

ActivityMaintained
ResponsivenessNo recent community issues