advance_phase
Move a project to its next design phase: strict mode blocks advancement and lists missing requirements; free mode advances and reports skipped items, then closes after verification.
Instructions
Move to the next phase. In 'strict' mode, it lists what is missing and does not advance. In 'free' mode, it advances and reports what was skipped. After 'verification' it closes the project.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| projectId | Yes |